background image

 

 

 

 

Riverlea Group Ltd warrant that the cladding used in the manufacture of the Guardian shed will not rust within 20 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

• 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

• 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

• 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

• 

Fastenings and fixings.

 

• 

Normal wear and tear, damage by impact or acts of God.

 

• 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

• 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit www.duratuf.co.nz/warranty to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group.

 

20 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

For a chance to WIN a 

$100 Prezzy Card!

 

 

To complete the survey please visit 

 

 

www.duratuf.co.nz/customer

-

survey 

 

COMPLETE OUR CUSTOMER SURVEY

 

Содержание Duratuf Guardian SHED SGS73

Страница 1: ...ASSEMBLY INSTRUCTIONS GS73 BASE SIZE 2 190m x 1 020m...

Страница 2: ...CHECK OUT OUR ASSEMBLY VIDEO...

Страница 3: ...ocess needs to be adhered to to qualify for the steel warranty of your Duratuf Guardian shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as ab...

Страница 4: ...90m 1 Front Wall 1 890m 2 Back Wall 1 950m 4 Back Wall 1 Pan 1 950m 1 Side Wall Angle 1 905m 2 Side Wall Angle 1 935m 2 Roof 1 110m 4 Roof 1 Pan 1 110m 1 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2...

Страница 5: ...RIPTION QTY DIAGRAM CHECKED Front Back Bottom Plates H4 Green 2 190 m 2 Front Back Top Plate H1 Red 2 190 m 2 Side Wall Bottom Plates H4 Green 1 020 m 2 Side Wall Top Plates H1 Red 1 022m 2 Spouting 2...

Страница 6: ...ASSEMBLE BACK PANEL Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets 4 Sheets 1Pan Sheet Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets 4 Shee...

Страница 7: ...hrough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plat...

Страница 8: ...door as shown ensuring narrow face of flashing is on the front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the b...

Страница 9: ...Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the wal...

Страница 10: ...er on overlaps as shown BOTTOM PLATE TOP PLATE TOP PLATE 15mm 15mm BOTTOM PLATE 15mm 15mm 1918mm 1918mm TOP PLATE STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of t...

Страница 11: ...MBER BASE PLATE READ THE FOLLOWING For sheds with Raised Base Plate option only see page 6 deduct 30mm from measurement shown between Top and Bottom Plates on all wall panels so cladding protrudes 20m...

Страница 12: ...h the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel Ensure that the Front Wall Sheets overlap the Side Wall Sheets Using 8 x 40mm scr...

Страница 13: ...ing up with the outside edge of the back wall cladding as in fig 4 Using 4 x 50mm Clouts predrill and nail the Roof Sheets to the Top Plates through the ribs at each corner ensuring ribs on the Roof S...

Страница 14: ...onry drill bit is required FITTING A GUARDIAN FLOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitt...

Страница 15: ......

Страница 16: ...cate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact o...

Отзывы: