Installation, Operation & Maintenance

Radiators with Fins on back side of panel (PRF &  

4. 

PR3F):

  With the radiator face down, attach each PR 

CLIP to the fins at the stud location.  With the radiator 
still  face  down,  thread  the  leveling  bolts  (5/16” 
carriage  bolts)  into  the 
bottom  threaded  positions 
with  a  crescent  wrench.  
Once the bolts have cleared 
the  paint  away,  they  should 
turn  easily  by  hand.    Hang 
the  panel  (installed  on  wall 
in  step  3)  onto  the  brackets 
to  determine  if  the  leveling 
bolts  are  properly  adjusted.  
Check  that  the  panel  is 
level.  

Radiators without Fins on back side of panel (PR, 

5. 

PR2 & PR2F): 

 With the radiator face down, thread 

the leveling bolts (5/16” carriage bolts) into the bottom 
threaded positions with a crescent wrench.  Once the 
bolts  have  cleared  the  paint  away,  they  should  turn 
easily  by  hand.    Hang  the  panel  onto  the  brackets 
(installed on wall in step 3) to determine if the leveling 
bolts  are  properly  adjusted.    Check  that  the  panel  is 
level.

Remove  the  radiator  from  the  wall  and  thread  the 

6. 

supply and return fittings into the connections on the 
radiator.    The  sealing  tape  or  pipe  dope  used  is  the 
installer’s choice – make sure the connections are leak 
tight.  One quarter of a turn past hand tight is usually 
sufficient.  Each radiator needs to be fitted with a 1/8” 
air vent prior to startup. 

Installation Instructions:

Radiators  are  boxed  together  in  as  few  crates  as 

1. 

possible.  A box of brackets is included as a separate 
piece, and it is marked to denote brackets.  Inside the 
crates, each panel is wrapped 
in foam sheeting.  Saving this 
foam  to  re-wrap  the  panel 
once it is wall mounted will 
protect  it  from  construction 
site damage.

Each radiator is tagged with 

2. 

a  label  that  indicates  the 
project  name,  model  type, 
color,  connection  code,  bracket  type  &  quantity  and 
tag number.  Locate each radiator as required.

Carefully place each radiator face down on a smooth 

3. 

level surface (i.e. floor or table).  Distribute the brackets 
for each radiator.  The tag on the radiator indicates the 
quantity of brackets.  Mount the brackets securely on 
wall studs or solid backing with two lag bolts, spacing 
them  as  evenly  as  possible  at  2’  to  4’  apart,  with  a 
bracket at least 12” from each end of the panel.  Allow 
a minimum of 3” below each panel radiator to facilitate 
cleaning and to assure proper output.  For baseboard 
models,  1”  above  the  floor  is  permissible  with  little 
loss of heat output.

Model PRF

Model PR2

Model PR2F

Содержание PR1

Страница 1: ... or pipe dope used is the installer s choice make sure the connections are leak tight One quarter of a turn past hand tight is usually sufficient Each radiator needs to be fitted with a 1 8 air vent prior to startup Installation Instructions Radiators are boxed together in as few crates as 1 possible A box of brackets is included as a separate piece and it is marked to denote brackets Inside the c...

Страница 2: ...curely fastened to the floor using appropriate fasteners Radiators sit on the pedestals with the fingers of the pedestals sticking up between the fins to provide stability Radiators expand a maximum of 0 016 inch per linear 4 foot of length if heated to 215º F Piping attached to the radiator must provide the necessary expansion compensation When the system has been shown to hold 50 psi 5 maximum a...

Страница 3: ...ng whether operated by a simple thermostat to baseboard loop system or an advanced boiler reset controller with motorized mixing valves constant circulation and two pipe distribution Radiator Maintenance Hydronic System Maintenance should include routine 1 checks for piping leaks usually indicated by frequent makeup water and a yearly diagnosis of the system water pH to evaluate its corrosive pote...

Страница 4: ...d on PED SM floor posts The ANG BKT PR PR2F or FIN BKT PRF PR3F wall mounting brackets supplied with the radiator are bolted to the floor post using nuts and bolts supplied by the installer The leveling bolt screws into the radiator and rests against the floor post to level the radiator The 3 x3 base has four mounting holes The installer supplies the appropriate mounting bolts to secure the PED SM...

Отзывы: