Rite‑Hite
®
Installation/Service/Owner's Manual
Eclipse
®
Dock Shelter (620G, 620NH)
Publication:
AMEN00141 2019-11-22
5
INSTALLATION
Preparation
Verify all components were received Notify your Rite‑Hite
Representative if parts are missing or damaged
Mounting Methods
NOTE:
Any additional fasteners, backer plates and
materials for additional structure are supplied by others
Concrete Block or Brick Wall
Through bolt fastening is required
• Bore a hole through the building wall
• Use a 3/8in [9mm] diameter threaded rod with
a washer, nut, and jam nut on each end
• Install a backer plate inside the building wall when
the wall will not support the bolt
Concrete Tilt-Up Walls (Precast)
Use 3/8in [9mm] lag bolts with expansion shields,
3/8in [9mm] 1 piece anchor bolts with expansion collar, or
equivalent fastener
If building wall is too thin to effectively hold the lag bolt or
anchor bolt, through bolt method of attachment is required
NOTE:
To determine anchor length, use anchor
manufacturer’s recommendation for minimum anchor
embedment
Metal Sided Building
Through bolt fastening is required
• Use a 3/8in [9mm] diameter bolt with a washer and
lock nut to fasten the unit to the structural member of
the building or to the backer plates If necessary, use a
3/8in [9mm] diameter threaded rod with a washer and
lock nut on each end
• Install a backer plate that is fastened directly to
structural member when it is not possible to fasten
directly to structural building members
NOTE:
See
for recommendations
Uninsulated Wall Building
Building Structural Member
Filler Boards*
Min 3/8in Fasteners*
Corrugated
Metal Siding
Head Frame
2x6 or Structural Steel Channel Backer
Angle Bracket*
Insulated Wall Building
Building Structural Member
Angle Bracket*
2x6 or Structural Steel Channel Backer*
Insulation
Filler Boards*
Head Frame
Pipe Spacers*
Corrugated
Metal Siding
Min 3/8in Fasteners*
*Supplied by others
Figure 2