INSTALLATION
Side Curtains
NOTE:
620NH side curtain shown Installation of 620G
side curtain is identical
NOTE:
Always align outside touch and hold fastener
flap (A1, A2) first.
B
A1
A2
Top View
A1, A2
B
1 Position top edge of side curtain approximately
1in [25mm] above the top edge of the side frame
and secure in place by pressing the touch and hold
fastener on the outside mounting flap (A1) to the
mating touch and hold fastener on the outside of the
side frames (A2)
NOTE:
When attaching the side curtain at the top,
DO NOT
let the weight of the side curtain hang on the
side frame until at least 24in [610mm] of the touch and
hold fastener is connected
2 Make sure that the mounting flap on the outside of
the side curtain completely covers and is properly
aligned with the touch and hold fastener on the side
frame
3 Continue to align the mounting flap to the outside of
the side frame touch and hold fastener and continue
working downward to the bottom of the side frame
Keep continuous downward pressure on side curtain
to avoid wrinkles in fabric
4 Starting at the top, repeat Steps 1 and 2, with the
inside mounting flap (B) The side curtain must be
perpendicular to the side frame when finished
C
5 Attach the side curtain pocket to the canopy
installation chain (C)
• First, run the “S” hook link part of the chain through
the loop on the pocket located at the top, backside
of the side curtain
• Run the chain coming in the loop from the top Pull
the chain just short of putting tension on the pocket
• Take the “S” hook link and hook back onto the chain
Make sure chain is not tangled “S” link does not
have to be closed, but can be if desired
Do this for both sides
Figure 13