D.
Riser Tube
- Install a riser tube and extend it at least one foot below frost line or
down to horizontal underground water line. For optimum water line protection, use
the 12” diameter insulated
Ritchie Thermal Tube
, part numbers and sizes are shown
to the right. Tube opening must be kept clear.
NOTE: The supply line touching the riser tube is the most common cause of
the supply line freezing. Do not surround the supply line with insulation, wood,
or other foreign material. Any foreign material in the tube may cause frost to
migrate to the supply line causing it to freeze.
E.
Mounting Platform
- A concrete platform (see diagram) must be provided for all fountains. Use a minimum
of 4” thick, (6” recommended thickness), large enough to accommodate fountain, and additional 4-6” step (on top
of the platform) extending 18” out from each side of the unit. This will protect the unit from manure handling
equipment, as well as discouraging animals from defecating in the fountain. Extending the platform provides
animals a place to stand while drinking, consider the size of your animals when determining the dimensions of your
platform. The concrete step and platform should slope away from the fountain for drainage. A rough broom finish
to concrete surface provides better footing for livestock.
F.
Hose Connection
- Connect hose fitting to shut-off valve at top of concrete. Slip on barb fitting with furnished
clamps. Hose should not touch insulation or outside surface of fountain. Place the hose under the fountain as you
move the unit in place over the riser tube.
G.
Preparing the Bottom -
Apply the provided foam weather stripping to the bottom of the fountain, following
along the outside edge of the fountain.
H.
Anchoring Fountain
- Your fountain has four built-in hold-down locations to anchor your unit securely to the
concrete pad. The use of 3/8” x 5” stainless steel expansion anchor bolts (not included) is recommended for concrete
installations. Anchor bolts are available from Ritchie in a two pack, part # 16555. Fender washers are supplied for
use with anchors.
I.
Assemble Standpipe
– Install standpipe into hole in
trough. Rubber O-ring is to be on inside of trough. Tighten
nut securely to prevent leaks. Do not overtighten or O-ring
may become dislodged.
Ritchie Thermal Tube
Part #
Description
18158
1’ Top Section
16417
2’ Top Section
16612
4’ Top Section
16416
2’ Extension
ULTRA-Fount Instruction Manual
2