
Tools Required:
●Cordless drill with phillips bit #1 & #2
● Standard set of drill bits
● 1/4" nut driver
● 5/16" nut driver
● Torpedo Level
● Chalk line (or a laser level if possible)
● Tape measure
Installation Steps:
1. Unbox ticker sections and lay them out according to the numbered labels located on the top surface of each ticker
section. Note: Section numbers begin at 1 and start from the right end of the ticker.
2. Use a chalk line or laser level to mark a line for the cleat rail on the wall where the ticker is to be installed. Use the
measurements in the table below to determine how far from the top of the ticker cabinet the cleat rail will sit. Attach the
cleat rail to the wall with screws at close intervals. Note: Some of the screws need to be drilled into studs or plywood.
Содержание TKR-M10-16-48
Страница 1: ...Quick Installation Guide LED ticker ...