background image

4 - 

FORCE

GB

Assembly instructions - FORCE 825K/825KI

Carry out the excavation in the ground with the measurements indicated
in the image alongside and prepare a suitable draining foundation.

DRAINAGE TEST

 Water has to drain out within 30/35 minutes. In case the water will remain

longer into the hole, it is necessary to drain the water out through a pipe
connected to a pit with an electric pump.

See the alongside image.

1500x1500 MIN.

B

C

495

1300

1800

A

A

:  CONCRETE

B

:  NON-WOVEN FABRIC

C

:  DRAINING GRAVEL

IMPORTANT: Carefully vibrate the concrete!

1500x1500 MIN.

B

C

A

CEMENTO
TESSUTO NON TESSUTO
GHIAIA DRENANTE

D

D

IMPACT DIRECTION

CABLE CONNECTOR BOX

VERY IMPORTANT:
CONNEXION PIPELAND D.50

1500

1500

400

NON-WOVEN FABRIC

Dig a hole down to 1800mm and introduce approx 30lt of water.

Insert the foundation case in the excavation. 

Attention: The case must 

rest on the bottom of the excavation and must be perfectly vertical - 

.

Important: In order to make inserting the case easier, preparation for the 

Insert the 50 mm diameter corrugated sheath in the case using the metal 
guide. 
The corrugated pipe must enter a maximum of 2/3 cm inside of the metal 
protection, so that it does not interfere when the bollard is later inserted.
Fix the case with cement.

-

der the cramp-iron is completely covered by concrete. Using a spirit 

.

Содержание FORCE 825K

Страница 1: ...tallationsanleitung Manuel d installation Manual de instalación Made in Italy RL8542750 Rev 00 GB Crash Tested rising bollard FORCE 825k FORCE825KI successfully passed the crash test and achived a Performance Rating of IWA14 1 2013 Rising Bollard V 2500 N1G 64 90 5 0 ...

Страница 2: ...2 FORCE GB Overall Dimentions 340x340 1420x1420 Ø 254 800 1356 810 Ø 305 1237 1 2m ...

Страница 3: ...istance to impact and elegant design is suitable for installation in public or commercial areas and is particularly indicated for protecting of buildings The standard version manufactured in steel is painted with electrophoresis painting a corrosion proof treatment that guarantees an extremely elevated resistance to the elements and to salty environments The bollard is operated with 24Vdc an amper...

Страница 4: ...1500x1500 MIN B C A MENTO SUTO NON TESSUTO AIA DRENANTE D D CABLE CONNECTOR BOX VERY IMPORTANT CONNEXION PIPELAND D 50 1500 1500 4 0 0 NON WOVEN FABRIC Dig a hole down to 1800mm and introduce approx 30lt of water Insert the foundation case in the excavation Attention The case must rest on the bottom of the excavation and must be perfectly vertical Important In order to make inserting the case easi...

Страница 5: ... that is suitable to avoid accidents that may involve per sons or property A sheet metal cover is available as an option Attention The bollard is equipped with a short segment of connec tion cable equipped with a male IP68 connector Different size extension cords are available 5 to 25 m equipped with a female IP68 connector for connecting to the control unit Bring the two parts of the connector to...

Страница 6: ... sheath For this reason is it necessary for the segment be tween the bollard and the junction box to be connected by a sheath with a diameter of 50 mm correctly placed without joints or cross section re ductions The cable must be gradually released while the bollard descends in the case Ref B Once the insertion has been completed the connector must be in proximity of the metal protection ref C Pay...

Отзывы: