
Installation Guide
Installation Procedures
First complete the electrical connections, and then check them for correctness.
Reset
Press the
Reset
button with a pointed object to reset
the unit to the original status.
Note: Press the RESET button with earse
the clock setiing and stored stations
Installation Opening
This unit can be installed in any dashboard
having an opening as shown above. The dashboard
should be 4.75mm - 5.56mm thick in order to be able
to support the unit.