27 |
P a g e
1.12
INSTALLING THE RAFTERS
1.
Starting at the center of the outer headers, lift and place one rafter on a matching pair of rafter tie brackets. Measure
the rafter overhang on each side of the outer headers and center the rafter.
2.
Drill 3/32” x 1-1/4” deep pilot holes in center of two holes in the Rafter Tie bracket faces on both sides of the rafter.
TWO HOLES ON
THIS SIDE ALSO
CENTER
RAFTER TIE