![RioOutdoors 6P-SC Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/riooutdoors/6p-sc/6p-sc_installation-instructions-manual_1463564011.webp)
1.7
6X6 HEADERS INSTALLATION
1.
Lift and place one 6x6 header into the U-channels of adjacent post-top bracket.
2.
Locate the two 5/16” holes on each vertical face of the U-channels holding the 6x6 header. Drill 3/32” X 1-1/4”
deep pilot holes at the center of four 5/16” Holes. Locate pilot holes at the center of each 5/16” hole.