
11 |
P a g e
1.7
POST-TOP DUAL HEADER BRACKET INSTALLATION
1.
Slide one Post-Top Dual Header Bracket over the 4x4 post top after aligning the headers receiver u-channels in the
proper direction. Let gravity work and pull the bracket all the way down on top of the post.
2.
Identify one 5/16” hole which is located at the center of the top surf ace of the dual header bracket.
3.
Wrap a piece of electrical tape around the drill bit, spaced 1-1/4” from the drill bit tip. This will act as a hole depth
indicator when you drill each pilot hole. Pilot holes should be drilled at least 1-1/4” deep. A little bit deeper is
acceptable but do not drill less than the required 1-1/4” depth.