
21 |
P a g e
1.12
LOWER HEADERS INSTALLATION
1.
Lift and slide one lower header into the Lower U-Channel.
2.
Center the header between the two posts by measuring the overhangs and moving the header until the overhang
lengths on both sides are equal.
3.
Repeat steps 1 and 2 for the remaining three lower headers. Your pergola should appear as shown, below, now.