![RioOutdoors 4S-QH Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/riooutdoors/4s-qh/4s-qh_installation-instructions-manual_1463552022.webp)
22 |
P a g e
5.
Drive ¼ X 1-1/4” Lag Screws through the pilot holes you drilled using a 7/16” socket and ratchet driver.
6.
Repeate steps 4 and 5 for the lower headers at all post-tops.
7.
Identify the 7/16” holes in the face of the lower U-channels. There are 2 such faces in each quad header bracket.