
17 |
P a g e
7.
Drive one ¼” X 1-1/4” SS lag screw through the pilot holes you drilled.
8.
Repeate steps 6 and 7 for the other side of both U-channels.
9.
Repeat Steps 6 to 8 for the other corner.
10.
Remove all shims from under the 4x4s.
11.
Tap top of 4x4s with a hammer to settle the 4x4s into the ground fabric.
12.
Using a 4 foot framing Level, check top surfaces of all 4x4s to see if they are level. Use shims as you see necessary to level
all three 4x4s that are sitting on the ground.