
30
| Symmetry RDV3611 installation guide 11156-H 08-21
Horizontal termination example
flue components required
900 mm min. vertical rise
540 mm min.
Symmetry RDV3611
1. Flue pipe 900 mm (R3635)
2. Wall strap
(R3647)
3. 90 º bend
(R3643)
4. Flue pipe*
5. Horiz. flashing kit (R3646)
6. Horiz. wall terminal (R3650)
* Size of flue pipe will depend on the
installation.
1
2
3
4
5
6