![Rinnai REU-V1620WB Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/rinnai/reu-v1620wb/reu-v1620wb_service-manual_1462647013.webp)
REU-V1620WG / REU-V1620WB / REU-V1620WS / REU-V2024WG
- 8 -
Issue 1 - 6/04/09 ©Rinnai
5. Smartstart
At least one temperature controller model MC-91Q must be used in conjunction with the water heater and
the Smartstart® system. Alternatively, if water controllers cannot be used a manual activation switch must
be used. Water Controllers cannot be used with the 1620WS model.
The installation of the water heater and temperature controllers must be performed in accordance with the
installation instructions supplied with the water heater.
The Smartstart® system is designed for domestic installations. However, it may be suitable for certain non
domestic installations. See separate service manual for more information.
Principle of Operation (Fig.2)
The "Smartstart®" system heats the water in the pipework water connected between the water heater and
the hot water outlets before any outlets are opened using the 'flow and return' pipework principle. This
results in water savings and reduced waiting time for heated water delivery from the outlet when opened.
Traditional 'flow and return' systems usually keep the water in the pipework heated continuously. The
Smartstart® system however, only heats the water before the outlet is opened. This results in significant
energy savings because water is not heated unnecessarily whilst retaining the benefits of traditional flow
and return systems.
A schematic of the Smartstart® system installed in conjunction with a Rinnai continuous flow water heater
and temperature controller is shown in Fig.2 below.
If problems are experienced with Smartstart® operation refer to the Smartstart® Service Manual.
Figure 2 - Non Solar Hot Water Systems
H
O
T
C
O
L
D
G
A
S
Cold Inlet Mains
S martstart®
Module
R innai Continuous
F low Water Heater
Hot Water
Outlet
Hot Water
Outlet
Heating Loop F low
Heating Loop R eturn
One or more
MC-91Q
Controllers
P reheat Button
Содержание REU-V1620WB
Страница 16: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 11 Issue 1 6 04 09 Rinnai 7 Operational Flow Chart ...
Страница 50: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 45 Issue 1 6 04 09 Rinnai ...
Страница 51: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 46 Issue 1 6 04 09 Rinnai ...
Страница 52: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 47 Issue 1 6 04 09 Rinnai ...
Страница 53: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 48 Issue 1 6 04 09 Rinnai REU V2024WG ...
Страница 54: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 49 Issue 1 6 04 09 Rinnai ...
Страница 55: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 50 Issue 1 6 04 09 Rinnai ...
Страница 56: ...REU V1620WG REU V1620WB REU V1620WS REU V2024WG 51 Issue 1 6 04 09 Rinnai ...