Page 11
Safety
Precautions
Page 9
9.
Cabling
Check that cabling will not be subject to wear, corrosion, excessive pressure, vibration, sharp edges or
any other adverse environmental effects. The check shall also take into account the effects of aging or
continual vibration from sources such as compressors or fans.
10.
Detection of flammable refrigerants
Under no circumstances shall potential sources of ignition be used in the searching for or detection
of refrigerant leaks. A halide torch (or any other detector using a naked flame) shall not be used.
11.
Leak detection methods
Ensure all service equipments are R290 rated including vacuum and recovery pump, leak
detector and pressure gauges.
The following leak detection methods are deemed acceptable for systems containing flammable
refrigerants. Electronic leak detectors shall be used to detect flammable refrigerants, but the sensitivity
may not be adequate, or may need re-calibration. (Detection equipment shall be calibrated in a
refrigerant-free area.) Leak detection equipment shall be set at a percentage of the LFL of the refrigerant
and shall be calibrated to the refrigerant employed and the appropriate percentage of gas (25 %
maximum) is confirmed. Leak detection fluids are suitable for use with most refrigerants but the use of
detergents containing chlorine shall be avoided as the chlorine may react with the refrigerant and
corrode the copper pipe-work. If a leak is suspected, all naked flames shall be removed/ extinguished.
If a
leakage of refrigerant is found which requires brazing, all of the refrigerant shall be recovered from
the
system, or isolated (by means of shut off valves) in a part of the system remote from the leak.
Oxygen
free nitrogen (OFN) shall then be purged through the system both before and during the
brazing
process.
12.
Removal and evacuation
When breaking into the refrigerant circuit to make repairs or for any other purpose conventional
procedures shall be used. However, it is important that best practice is followed since flammability is a
consideration. The following procedure shall be adhered to:
Remove refrigerant; Purge the circuit with inert gas; Evacuate; Purge again with inert gas; Open the
circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders
with the use of R290 rated
recovery equipment
. The system shall be flushed
with OFN to render the unit safe. This process may
need to be repeated several times.
Compressed air or oxygen shall not be used for this task.
Flushing shall be achieved by breaking the vacuum in the system
with OFN and continuing to fill until
the working pressure is achieved, then venting to atmosphere, and
finally pulling down to a vacuum.
This process shall be repeated until no refrigerant is within the system.
When the final OFN charge is
used, the system shall be vented down to atmospheric pressure to enable
work to take place. This
operation is absolutely vital if brazing operations on the pipe-work are to take
place. Ensure that the
outlet for the vacuum pump is not close to any ignition sources and there is
ventilation available.
13.
Charging procedures
In addition to conventional charging procedures, the following requirements shall be followed. Ensure
that contamination of different refrigerants does not occur when using charging equipment. Hoses or
lines shall be as short as possible to minimise the amount of refrigerant contained in them.
Cylinders shall be kept upright.
Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
Label the system when charging is complete (if not already).
Extreme care shall be taken not to overfill the refrigeration system. Prior to recharging the system it
shall
be pressure tested with OFN. The system shall be leak tested on completion of charging but prior
to
commissioning. A follow up leak test shall be carried out prior to leaving the site.
Safety
Precautions
Содержание PoloCool EX10C
Страница 15: ...Page 15 Description Description of each part and function ...
Страница 17: ...Page 17 Installation Instructions Mounting of Assembled Air Exhaust Hose ...
Страница 18: ...Page 18 Installation Instructions Window Slider Installation ...
Страница 19: ...Page 19 Operating Instructions Description of the Control Panel Operating Instructions ...
Страница 20: ...Page 20 Operating Instructions Operating from the Control Panel ...
Страница 25: ...Page 25 Self Diagnosis Remote Control ...
Страница 27: ...Page 27 Cleaning Maintenance Maintenance ...
Страница 28: ...Page 28 Troubleshooting Troubleshooting ...
Страница 33: ...Page 33 NOTES ...
Страница 34: ...Page 34 NOTES ...
Страница 35: ...Page 35 NOTES ...