![Rinnai HD200i Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/rinnai/hd200i/hd200i_installation-manual_1463023009.webp)
Continuous flow internal flueing guide: 11748-E 05-15
|
9
Vertical straight flueing
For installations where the Rinnai INFINITY needs to be flued vertically
through the roof.
FFSSROOFCOWL
(with roof protectors fitted)
FFSSPIPE1000
Additional lengths can be
added as required (can be
cut to size)
FFSSCOND
(HDi200 only)
To sanitary waste
For HDi200 units, a condensate trap (FFSSCOND) is
required for flue lengths over 1.5 m. Total flue length
can be 15 m.
Combination flueing
Combination of vertical and horizontal flueing. HDi200 unit will need a
condensate trap kit (FFSSCOND).
FFSSROOFCOWL
(with roof protectors fitted)
FFSSPIPE1000
FFSSCOND
(HDi200 only)
To sanitary waste
Condensate direction
(2 ˚ fall to appliance)
If starting horizontally and finishing horizontally, use
FFSSKIT as a starting point and customise.
If starting horizontally and ending vertically or vice
versa, individual flue components will need to be
ordered. Flueing must start with a FFSSBEND90 or
FFSSPIPE1000 (can be cut to size).