![Rinnai GHF4135L Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/rinnai/ghf4135l/ghf4135l_operation-and-installation-manual_1463020008.webp)
Rinnai Australia
6
Operation & Installation Manual
GENERAL INSTALLATION INSTRUCTIONS
Wall Brackets
For convenience, a wall mounting bracket and fixing screws are included with the Rinnai appliance.
AS/NZS 5601.1 state that gas appliances shall be suitably supported or secured to a durable structure
that is appropriate for the installation.
If this appliance is suitably supported on a durable structure then the installation of this bracket is at
the discretion of the installer.
STEP 1.
Locate bracket at the top rear of the water heater and mark
one of the three options for wall drilling, while in the same
position mark the two self-tapping screw positions for the tank.
STEP 2.
Fix bracket to the top of the tank using the self-tapping screws
provided.
STEP 3.
Fix bracket to the wall using a suitable fastener (installer to
supply)
Safe Tray
If property damage could occur as a result of a leak or spillage from the water heater then a properly
drained safe tray must be installed. The safe tray must be constructed and installed to the
requirements of AS/NZS 3500.4 and any other local codes and regulatory authority requirements.
Water Supply Pressure
This water heater is designed for direct connection to water supply pressures of no greater than:
800 kPa - On All Models
Where the mains pressure can exceed or fluctuate beyond the pressure shown above a pressure
limiting device (complying with AS 1357) must be fitted in the cold water inlet supply. This device must
be installed after the isolating valve and set below the pressure shown above. During periods of lower
demand water pressure may increase.
Pool Heating
This water heater must not be used for pool heating.
Pressure & Temperature Relief Valve
The Pressure & Temperature Relief Valve is supplied loose with the water heater. The valve rating is:
1000 kPa on All Models
•
The PTR valve must be installed directly into the top socket marked "RELIEF VALVE". The drain
line from this valve must run in a continuously downward direction in a frost-free ambient position
with the discharge end left open to atmosphere permanently.
•
The PTR Valve is not intended to enable connection of the water heater to supplementary energy
sources such as solar panels or slow combustion stoves (refer AS/NZS 3500.4 for guidance on
these types of installations).
•
Open the PTR Valve for approximately 10 seconds by lifting the lever on the valve to ensure water
is relieved to waste through the relief drain pipe. Lower lever gently and check that it closes
correctly.
Содержание GHF4135L
Страница 2: ...This page is intentionally blank...
Страница 19: ...This page is intentionally blank...