Rinnai FS35ETRBL/US Скачать руководство пользователя страница 16

 16

TESTING PROCEDURE

Turn gas supply on and plug the unit into
the power supply. (Caution 115V)

TO CHECK BURNER PRESSURE

•  Refer to rating plate.

•   Remove the wiring cover panel.

•  Remove test point plug and attach

manometer to test point.

   The test point is on the bottom front face

of the gas valve.

•  Light heater, turn to High heat setting and

check pressure.

•  If adjustments are necessary, the

regulator is situated on the front of the
gas control.

•  After checking pressure, turn the unit off,

remove manometer and replace test
point plug.

•  Turn the heater on and off a few times to

check ignition.

•  When you are satisfied that the heater is

working correctly, reassemble panels.

•  All burner aeration is factory preset and

cannot be adjusted.

•  If you are unable to get the unit to operate

correctly, refer to Troubleshooting on
Page 20, before contacting your local
service contact as listed on Page 3.

•  It may take approximately 2 hours for the

logs to achieve their full flame pattern
and glow.

•  

During the initial burning in period,

some smoke and smell may be
experienced.  The heater should be
run on the high position in a well
ventilated room until these
dissipate.

TESTING AND COMMISSIONING

It is the responsibility of the installer
to check that under normal operating
conditions of the appliance, all flue
gases are exhausted to the outside
atmosphere and that there is no
spillage of combustion gases into the
room.

COMMISSIONING

INSTALLATION / COMMISSIONING

CHECKLIST

Complete the installation  checklist and the
installer details on page 27 and make sure
that this instruction book is left with the
customer.

INSTRUCT CUSTOMER ON USE OF

UNIT

Explain to the customer about use and care
of unit.  Make sure the customer
understands the instructions.

EXPLAIN

Ignition (on / off), adjusting heat level,
programming timers, flame setting, auto
off, lock, override and the remote control.

NOTE:

THE MANUFACTURE RESERVES THE
RIGHT TO CHANGE OR MODIFY
SPECIFICATIONS WITHOUT NOTICE

Содержание FS35ETRBL/US

Страница 1: ...department Installation and service must be performed by a qualified installer service agency or the gas supplier This heater has been designed to code ANSI Z 21 88a 2000 effective 7 1 2002 This appl...

Страница 2: ...void the Warranty For the name of theAuthorized Distributor or Installer nearest you please contact your local HVAC dealer or gas service technician visit the Rinnai website www rinnai us callRinnaiat...

Страница 3: ...cations 7 For your Safety 8 Control panel layout 9 Operation 9 Location 13 Venting 14 Gas connection 14 Log installation 15 Testing and commissioning 16 Maintenance instructions 17 PCB layout 19 Wirin...

Страница 4: ...ft flue system Output 24 000 Btu hr Natural Gas 22 000 Btu hr Propane Gas Control Electronic control valve Burners Ember bed flame and heat burner Warm Air Discharge Top front louvres Flue Natural dra...

Страница 5: ...side of pillar Refer to local gas authority for confirmation of the gas type if you are in doubt Included in the carton Customer operation information IMPORTANT Before using this product please read...

Страница 6: ...BE LOCATED OUT OF TRAFFIC AND AWAY FROM FURNITUREAND DRAPERIES 32 CHILDRENANDADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATURES AND SHOULD STAYAWAY TO AVOID BURNS OR CLOTHING IGNITIO...

Страница 7: ...e Btu hr Btu hr Pilot 200 200 Low 11 000 9 000 High 32 000 29 000 WC WC Min 7 10 Max 10 5 13 Gas Connection Flue Termination Fan Combustion System Ignition System Operation Temperature control Electro...

Страница 8: ...turn off To re attempt ignition press the On Off button again To adjust the heat Press the and buttons to increase and decrease the room temperature setting To turn the unit off Press the On Off butto...

Страница 9: ...ss the ON OFF button OFF then ON again TURNING OFF Simply press the ON OFF button to switch off the unit The ON indicator will go out The convection fan will continue to operate for several minutes af...

Страница 10: ...hen the correct hour shows on the Digital Display Confirm that you have selectedAM or PM as required a small indicator on the left hand side of the Digital Display indicates the AM PM setting Use the...

Страница 11: ...failure the system memory will retain the Timer programs and the clock will stop at the time the power goes off The clock will start again when the power comes back on but the time will be slow by th...

Страница 12: ...f the remote control The clip is removed by inserting a coin or similar into the recess in the back of the remote control and sliding downwards The battery must be of type CR 2032 and will only operat...

Страница 13: ...ances required LOCATION When positioning the heater the main points governing the location are 5 The heater is not designed to be built into bookcases or shelves or any combustible opening 6 Check tha...

Страница 14: ...inner flue must be supported independently of the heater but allowing sufficient movement to allow connections to and disconnections from the flue collar It is recommended that the flue be installed v...

Страница 15: ...ewdriver and remove excess material Note The ember bed material must be placed after the logs are fitted If the logs are to be removed for any reason the ember bed material must be removed first and r...

Страница 16: ...n Page 3 It may take approximately 2 hours for the logs to achieve their full flame pattern and glow During the initial burning in period some smoke and smell may be experienced The heater should be r...

Страница 17: ...or distort any part of the heater Do not use wet cloth or spray cleaners on burners VENT MAINTENANCE The flue should be inspected annually for blockages and signs of damage VISUAL INSPECTION OF FLAME...

Страница 18: ...aner Soot deposit may indicate that the flue is not drawing properly Check the flue for correct operation It is best to handle the glass with clean gloves to avoid smearing the glass with finger print...

Страница 19: ...19 WIRING DIAGRAM PCB LAYOUT Caution Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify proper operation after servicing...

Страница 20: ...er still warming up Small soot deposit Normal operation No action required Inadequate flue system Log misalignment Call service department agent Incorrect gas pressure Condensation on glass Normal ope...

Страница 21: ...block Service call Power failure Service call Room temperature sensor faulty ERROR CODES ERROR CODE MESSAGE The Flame Fire ETR has the ability to check its own operation continuously If a fault occur...

Страница 22: ...22 EXPLODED DIAGRAMS...

Страница 23: ...23...

Страница 24: ...T33 MULTI NG 1 7175 INJECTOR BRAY 120 CAT23 SINGLE LP 21 1 7337 INJECTOR BRAY 560 CAT33 MULTI NG 1 7183 INJECTOR BRAY 200 CAT33 MULTI LP 23 1 7906 INJECTOR BRAY 180 CAT23 SINGLE NG 1 7175 INJECTOR BRA...

Страница 25: ...RD 15 8 GOLD BLACK 1 7099BN LOUVRE TUBE RD 15 8 BKL NICKLE SILVER 68 1 4996 GLASS PANEL ASSY IB35 FS35 69 1 7004 BURNER DIVERT PANEL PTD ETR 70 1 7033 GLASS RET TOP ASSY PAINTED 71 1 7037 GLASS RET BO...

Страница 26: ...26 INSTALLATION NOTES...

Страница 27: ...thout delay 7 Is the end user fully aware of operating procedure NO YES Company name _______________________________________________________ Installers name ___________________________________________...

Страница 28: ...Part Number 7917 zx...

Отзывы: