6 Canadian Air Handler Installation and Operation Manual
When transporting components of the hydronic
air handler, follow the guidelines below:
•
Choose the correct hand truck to support
the weight and size of the system
components. Refer to section
“3.7
Specifications
”
for specific weights and
dimensions.
•
Use safe lifting and material handling
principles to prevent workplace accidents.
•
Use proper lifting techniques to load the
equipment onto a hand truck.
•
Position the equipment onto the hand
truck so the weight is evenly balanced.
•
Use personal protective equipment, such
as gloves and steel
-
toed boots.
If storing components of the hydronic air
handler, follow the guidelines below:
•
Store system components in a clean, dry
environment.
•
Components must be protected from
direct sunlight.
•
Do not store components outdoors.
•
If transported or stored at temperatures
below 32°F (0°C), the components must
be warmed up to 60°F (15°C) before the
start of assembly.
•
All components must be stored in the
original packaging.
Example:
CAH050CE
CAH
050
E
Blower Motor
E
= ECM Motor
Nominal Heating Capacity
at 3GPM and 140° F
050
= 50,000 BTU
Series
CAH Series
C
Accessory
Circulator Pump
included with the
air handler (if
applicable)
Содержание CAH Series
Страница 1: ...C US ...
Страница 2: ...2 Canadian Air Handler Installation and Operation Manual ...
Страница 39: ...Canadian Air Handler Installation and Operation Manual 39 ...
Страница 44: ......