Rinnai ASPIRATION RHFE-750ETR Скачать руководство пользователя страница 13

Rinnai Australia

11

ASP Flue Installation Manual

FLUE COMPONENT ASSEMBLY

4. Slide the external wall plate over the outer pipe protruding through the exterior wall. 

 

 Align the arrow

symbol to point downwards which will result in a 2° fall of the horizontal section of flue pipe towards the
appliance as required.

 

 Once the external wall plate is in the correct position secure it to the wall using the three 22mm screws

into the holes provided. 

 

 The wall plate is then secured to the outer pipe of the flue protrusion using the

two horizontal holes and the two 7mm screws provided.

5.

 Cut the flue pipe end protruding through the exterior wall in accordance with “CUTTING ~ ASPDFK,

ESPIPE900 & ESROOFCOWL” on page 17. 

6. Now prepare the vertical section of the flue system by assembling, connecting and securing ESBEND,

ESCONDK and subsequent ESPIPE900 lengths as required in accordance with the relevant sections under
“COMPONENT ASSEMBLY & CONNECTION ~ ESBEND” on page 19, “COMPONENT ASSEMBLY &
CONNECTION ~ ESCONDK” on page 19 and “COMPONENT ASSEMBLY & CONNECTION ~ ESPIPE900”
on page 17.  

7. If a vertical roof terminal is used cut in accordance with“CUTTING ~ ASPDFK, ESPIPE900 & ESROOFCOWL”

on page 17 and assemble and connect in accordance with “COMPONENT ASSEMBLY & CONNECTION ~
ESROOFCOWL” on page 19. 

If a horizontal terminal is used cut in accordance with“CUTTING ~ ASPDFK, ESPIPE900 & ESROOFCOWL”
on page 17 and assemble and connect in accordance with “ASSEMBLING AN ON-WALL TERMINAL ~
ESWTKIT, ESBEND & ESPIPE900” on page 18.

8. Move the heater into place and make the heater exhaust and combustion air hose connections in accordance

with the section “CONNECTING HEATER EXHAUST & AIR SUPPLY” on page 20.  

9. Follow steps 6 through 11 from the chapter “Heater Installation” in the “Rinnai ASPIRATION Operation /

Installation Manual” supplied with the heater and complete the installation and commissioning of the heater in
accordance with these.

 The joints between ASPDFK and ESPIPE900 and any additional ESPIPE900 lengths MUST BE

secured by a pop rivet or screw through the outer co-ax pipes to prevent accidental or erroneous
dislodgement. 

ASPDFK components and ESPIPE900 DO NOT require cutting to be joined.

 ONLY use PVC cement between joints of the 'outer' PVC flue pipes to secure and seal these

joints against ingress of dust and water. 

  ONLY use non acidic silicone sealant between the joints of 'outer' PVC flue pipes and any

mating aluminium components (such as the condensate trap) to secure and seal these joints
against ingress of dust and water. Silicone containing acetic acid (vinegar) or other acids as the
curing agent may cause corrosion of aluminium components and must not be used.  

  Secure the vertical flue sections to the wall using the clips provided to prevent accidental

dislodgement.

Air hose and heater exhaust connections at the energysaver heater MUST be made and checked
in accordance with these instructions. Improper connections may result in dangerous situations,
for example, the dispersion of combustion products in the space being heated. 

Содержание ASPIRATION RHFE-750ETR

Страница 1: ...urer s Installation Instructions Current AS NZS 3000 AS NZS 3500 AS 5601 Local Regulations and Municipal Building Codes THESE COMPONENTS MUST BE INSTALLED SERVICED AND REMOVED BY AN AUTHORISED PERSON...

Страница 2: ...COMPONENTS 3 INSTALLATION CONFIGURATIONS 4 WALL PENETRATIONS 6 FLUE COMPONENTS 7 FLUE COMPONENT ASSEMBLY 8 CREATING A DIRECT FLUE INSTALLATION 8 CREATING A DIRECT EXTENDED FLUE INSTALLATION 9 CREATING...

Страница 3: ...RD Denotes items that are not required for the specific installation OBSERVE CORRECT ORIENTATION Where specified ensure that components are installed with the correct vertical or horizontal orientatio...

Страница 4: ...ory Regulation Rinnai Energysaver space heaters when correctly installed with Rinnai approved flue components are room sealed appliances and no internal ventilation is required Rinnai Energysaver spac...

Страница 5: ...manating from the front of this appliance may over time affect the appearance of some materials used for flooring such as carpet vinyl cork or timber This effect may be amplified if the air in the roo...

Страница 6: ...Cowl ASPDFK ESPIPE900 ESBEND ESCONDK ESROOFCOWL Direct Flue Kit 750 Co Ax Pipe 900mm Bend 45 x2 Condensate Trap Wall Terminal Kit ASPDFK ESPIPE900 ESBEND ESCONDK ESWTKIT INTERNAL WALL Components Opti...

Страница 7: ...he minimum total length is not to be less than 300mm DIRECT EXTENDED EXTERNAL WALL INTERNAL WALL DIRECT EXTENDED UNDER FLOOR SIDEWAYS SIDEWAYS EXTERNAL WALL DIRECT EXTENDED When cutting the flue trans...

Страница 8: ...d Direct Extended flue installations where the flue terminal is located directly to the rear of the appliance If no flue pipe penetration is required the markings are still useful for indicating the c...

Страница 9: ...OOFCOWL ESPIPE900 Co ax V erticle Terminal Co ax Pipe Wall Clip Wall Clip Wall Clip Silicon Grease Drain Tube Internal Wall Plate External Wall Plate Flue Terminal Pipe Centring Spacer ESPLATE Externa...

Страница 10: ...ed on the raised ring of the flue transition 3 Pass the ASPDFK through the internal wall penetration until the internal wall plate is flush with the wall 4 Create the wall terminal in accordance with...

Страница 11: ...page 18 5 Move the heater into place and make the heater exhaust and combustion air hose connections in accordance with the section CONNECTING HEATER EXHAUST AIR SUPPLY on page 20 6 Follow steps 6 th...

Страница 12: ...s note that a direct extended flue installation example is illustrated above Slide the internal wall plate over the terminal end of the assembled flue pipe until it is nested on the raised ring of the...

Страница 13: ...dance with ASSEMBLING AN ON WALL TERMINAL ESWTKIT ESBEND ESPIPE900 on page 18 8 Move the heater into place and make the heater exhaust and combustion air hose connections in accordance with the sectio...

Страница 14: ...heater in accordance with the instructions on page 21 7 Follow steps 6 through 11 from the chapter Heater Installation in the Rinnai ASPIRATION Operation Installation Manual supplied with the heater a...

Страница 15: ...ing Direct Creating Direct Extended Flue Installations As Required z Finalise Installation Commissioning Of Heater To prevent accidental or erroneous dislodgement the joints between transition assembl...

Страница 16: ...exhaust and combustion air hose connections in accordance with the section CONNECTING HEATER EXHAUST AIR SUPPLY on page 20 10 Follow steps 6 through 11 from the chapter Heater Installation in the Rin...

Страница 17: ...outlet and mount the assembled ASPKIT03 components in this location in an downwards vertical manner Activities for creating a Under Floor flue installation a Assemble Flue Adaption Kit 750 ASPKIT03 b...

Страница 18: ...from the chapter Heater Installation in the Rinnai ASPIRATION Operation Installation Manual supplied with the heater and complete the installation and commissioning of the heater in accordance with t...

Страница 19: ...ONENT ASSEMBLY CONNECTION ESPIPE900 Lubricate O Rings with the supplied O ring grease then fit the female aluminium inner pipe end over the male inner pipe ends of an adjoining component Cutting is no...

Страница 20: ...END ESPIPE900 1 Measure off the required terminal length then mark off for cutting allow an additional 50mm for joining to other components Cut the outer pipe at this mark Take care to NOT cut the inn...

Страница 21: ...in the section REGULATIONS CLEARANCES GENERAL INFORMATION on page 2 ONLY use PVC cement between externally located joints of PVC pipes to secure and seal these joints against ingress of dust and wate...

Страница 22: ...pipe whilst the finger tabs are secured around the collar of the fixed part of the exhaust CONNECTING COMBUSTION AIR HOSE This section describes how to connect the exhaust pipe from the Aspiration he...

Страница 23: ...sertion point which is a rubber grommet found at the rear of the heater to the right of the combustion air hose connection Insert the condensate tube through the rubber grommet until you reach the 90...

Страница 24: ...624 Address 105 Pavilion Drive Airport Oaks Mangere Manukau PO Box 53177 Auckland Airport Manukau 2150 Phone 09 257 3800 Fax 09 257 3899 Email info rinnai co nz Websites www rinnai co nz and www rinn...

Отзывы: