RIKA SOL RIKATRONIC4 Скачать руководство пользователя страница 12

12

5. ASSEMBLY / DISMANTLING STONE

Note

Only work on the unit when the stove has cooled down completely�

Type Rikatronic4: Only work on the unit when it is switched off and 
the mains plug has been disconnected�

Note

During any conversion work, take particular care of your fingers 
and any panels and stove attachments� Select soft bases to 
prevent scratches to your living space furniture and stove panels� 

Assembly / disassembly stone

If you open the combustion chamber door, you have better access 
to the stone� Lift up the top stone with a second person, he is just on 
the stove�

Remove the bolts which secure the stone on one side only� Caution, 
the stone can tilt outwards!

Tilt the stone carefully slightly outward and lift it off the bottom bolts� 
Place the stone flat on a soft base� The stone should never be placed 
on the edges - risk of breakage!

Remove the locking bolts and the stone from the other side the same 
way�

Содержание SOL RIKATRONIC4

Страница 1: ...Operating manual SOL SOL RIKATRONIC4 ...

Страница 2: ...ting to a steel chimney 8 Combustion air 8 Feeding in external combustion air 8 3 IMPORTANT INFORMATION 9 General warning and safety information 9 First heating 9 Safety distances 9 Prior to set up 10 4 BRIEF INFORMATION ON COMBUSTIBLE LOGS 11 Suitable fuels and fuel amounts 11 Wood types 11 Output controlling 11 Clean combustion 11 5 ASSEMBLY DISMANTLING STONE 12 Assembly disassembly stone 12 6 M...

Страница 3: ...ure sensor 14 Cleaning painted surfaces 14 Cleaning the convection air openings 15 Combustion air intake 15 Cleaning the flue pipes 15 Checking door seal 15 Checking the door bolts 15 8 PROBLEMS POSSIBLE SOLUTIONS 16 Problem 1 16 Problem 2 16 Problem 3 16 9 GUARANTEE CONDITIONS 17 10 WARRANTY CONDITIONS 17 1 PREFACE Explanations to symbols Important Note 25 Hexalobular T25 Hacksaw Useful Tip Manua...

Страница 4: ...horised for the small firing system is to keep the technical documentation and is to submit it to the authorities or the chimney sweep on request Note Please observe the national and European standards as well as local regulations concerning the installation and operation of firing installations Packaging Your first impression is important to us The packaging of your new stove provides excellent p...

Страница 5: ...w exploded diagram 1 10 13 12 12 25 23 26 24 20 22 21 15 15 14 14 10 13 12 19 11 16 16 8 2 4 3 5 9 7 6 18 17 11 38 40 38 39 32 30 31 44 43 35 35 34 42 33 41 37 37 36 27 28 29 47 48 49 50 59 58 60 46 45 45 57 56 55 51 51 54 52 53 ...

Страница 6: ...72 71 73 65 61 70 62 63 64 66 68 67 69 108 107 109 110 85 87 86 84 111 82 81 80 83 89 90 98 97 99 96 100 103 106 104 105 102 101 95 91 92 88 94 RIKATRONIC4 ...

Страница 7: ...ide casing stone white 46 N103693 Flat seal black 8x2 47 L02766 Stone retaining bracket 48 N108395 Hexagon socket screw 49 L00977 Screw plate 50 Z33324 Cover centering bolt 51 Z32643 Bolt 52 Z36022 Soapstone top Nr Art Nr Description Z36078 Sandstone top Z36023 Stone white top 53 Z36640 Soapstone top AH Z36641 Sandstone top AH Z36642 Stone white top AH 54 L02746 Locking plate 55 L02745 Mounting an...

Страница 8: ... be calculated and shown with EN13384 1 and EN13384 2 Use only insulated double stainless steel tubes flexible aluminum or steel tubes are not permitted An inspection door for regular inspection and cleaning must be present The flue pipe connection to the chimney has to be air tight Combustion air Every combustion process requires oxygen from the surrounding air This so called combustion air is re...

Страница 9: ... to be worn when post heating Q Use the heat resistant gloves supplied to open the doors of your stove Q Only use suitable tools from our range of accessories when handling embers and make sure that no embers fall out of the combustion chamber onto inflammable material Q Push the embers together to form a firebed when you add new fuel logs Q Placing non heat resistant objects on the stove or near ...

Страница 10: ...d with the combustion chamber door closed Q The combustion chamber door may only be opened to add fuel and must then be closed again otherwise other firing installations connected to the chimney may be endangered Q The combustion chamber door is to be kept closed when the stove is not in operation Q Fouling of the chimney i e deposits of highly inflammable materials such as soot and tar and subseq...

Страница 11: ...s particularly suitable It burns with a constant flame and forms long lasting embers Coniferous wood has higher levels of resin and burns off faster as do all softwoods and tends to spray sparks Wood type Calorific value kWh m3 Calorific value kWh kg Maple 1900 4 1 Birch 1900 4 3 Beech 2100 4 2 Oak 2100 4 2 Alder 1500 4 1 Ash 2100 4 2 Spruce 1700 4 4 Larch 1700 4 4 Poplar 1200 4 1 Robinia 2100 4 1...

Страница 12: ...our living space furniture and stove panels Assembly disassembly stone If you open the combustion chamber door you have better access to the stone Lift up the top stone with a second person he is just on the stove Remove the bolts which secure the stone on one side only Caution the stone can tilt outwards Tilt the stone carefully slightly outward and lift it off the bottom bolts Place the stone fl...

Страница 13: ... position Open the combustion chamber door and sweep the ashes into the ashtray Place left and right two small pieces of chipboard lengthways in the bottom of the combustion chamber Place two logs crossways on top of this chipboard 2 Now place further pieces of chipboard in crosswise layers on top of the logs and place 2 4 ribs of the RIKA firelighter on the left on top of the chipboard Some uncoa...

Страница 14: ...er only type RIKATRONIC4 Remove the grate and vacuum out the ignition sled and the pipe of the ignition Note Only when the stove is cold You could vacuum out embers FIRE RISK Empty the ash drawer Empty the ash drawer regularly The ash drawer is simply pulled forward with the combustion chamber door open Checking the door contact Only for models with Rikatronic Check that the door contact switch is...

Страница 15: ...lly Remove the flue pipes Inspect and clean the chimney connection Brush off any soot and dust deposits in the fire and in the flue pipes and vacuum Note Accumulated fly ash in the flue gas channels may impair the performance of the stove and pose a safety risk Checking door seal Annually The condition of the seals at doors and glass should be checked at least once a year Repair or replace seals d...

Страница 16: ...ass cleaner Problem 2 Stove smells strongly and or fumes are emitted Cause s Q Burning in phase taking into service Q Stove has accumulated dust and or dirt Possible solution s Q Wait to end of burning in phase and vent sufficiently Q Suction off any dust deposits from the convection air openings at regular intervals Problem 3 Flue gas discharge when wood is added and during heating phase Cause s ...

Страница 17: ...tified for that type of stove The installation is performed by a RIKA certified technician If these points are not complied with the guarantee claim is void Any costs incurred by the manufacturer as a result of an unjustified guarantee claim will be charged back to the claimant Likewise excluded from the guarantee is any damage resulting from or caused by non compliance with the manufacturer s ins...

Страница 18: ...life cycle In accordance with the European Directive 2012 19 EU Waste Electrical and Electronic Equipment WEEE and other local regulations RIKA supports the setup of take back systems and recycling infrastructures Old devices can easily be returned to the municipal waste collectors for recycling purposes Please observe the national regulations to that end The device may not be disposed of in the n...

Страница 19: ... 19 18 EN ...

Страница 20: ... only valid one Subject to technical and visual changes as well as layout and printing errors 2021 RIKA Innovative Ofentechnik GmbH Z36321_Sol_R4_EN 12 01 2021 RIKA Innovative Ofentechnik GmbH Müllerviertel 20 4563 Micheldorf AUSTRIA Tel 43 0 7582 686 41 Fax 43 verkauf rika at www rika at ...

Отзывы: