![RightAngle NewHeights 4 NFD Series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/rightangle/newheights-4-nfd-series/newheights-4-nfd-series_assembly-instructions-manual_1460710007.webp)
Page 5 OF 6
K&A Manufacturing
6703 Zinser Street Schofield, WI 54476
Phone: 800.298.4351
Fax: 866.882.9475
www.raproducts.com
Instruction # 53322
Step 7:
Build the subassembly shown below. Slide a weld
nut
9
into the groove in the cross support
11
. The
projections on the weld nut must face out from the groove.
With the help of an assistant, insert (4) socket screws
6
through the holes on the wide side of the L-bracket
10
and thread them into the weld nut inside the groove on
the cross support. Do not fully tighten. Insert an end cap
8
into the end of the cross
support subassembly.
Step 8:
With the help of an assistant, insert (2) socket screws
6
through the holes on the
narrow side of the L-bracket
10
and thread them into the weld nut in the first cross
support
11
. See Detail C. Do not fully tighten. insert (2) socket screws
6
through the
holes on the opposite end of the cross support and thread them into the weld nut in the
groove on the back of the third leg assembly
5
.See Detail A on Page 4. Level the cross
support with the first cross support and fully tighten all the socket screws. Insert an end
cap
8
into the end of the cross support. Attach the third leg assembly
5
to the work-
surface with (8) wood screws
4
. Fully tighten.
8
6
C
10
6
Detail C
8
10
6
9
11
Build this as a subassembly
before installing it on the workstation.
Steps 7 & 8