background image

4

 

panel  and  the  boiler  should  be  carried  out  by  qualified 

personnel in compliance with the reference regulations and 

standards.   

 

9

The burner should be purchased separately, this manual 

contains only information regarding the boilers and the 

boiler warranty does not extend to the burner. It is necessary 

to consult the burner's instruction manual and have the 

Warranty  Certificate  issued  for  the  burner  by  the  dealer 

where it was purchased.

 

9

Before starting the burner, make sure that the front door of 

the boiler is closed tight and that the burner connections 

have been carried out correctly.

 

9

Do  not  touch  the  hot  water  pipes  and  the  flues  gases 

discharge pipe when the boiler is running.

1.1 

General warnings

The boiler models in this manual are delivered fully assembled.

 

9

The cast iron boilersRTT 29-79 are designed for heating using 

water and/or supplying hot water systems and have been 

designed with technologies and materials suitable for this 

purpose. Use the product only for this intended use.

 

9

The installation of the appliance should be carried out on a 

base that is suited to the weight and the dimensions.

 

9

The base of the boiler should be positioned and oriented in 

such a way as to leave sufficient space on the sides of the 

appliance to meet safety requirements and permit access to 

the boiler for maintenance and repairs.

 

9

The commissioning and initial ignition of the boiler should 

only be carried out by specialised installers.

 

9

It is forbidden to put or pump water into the boiler or the 

hydraulic system when the appliance is running and is hot.

 

9

Before putting water in the boiler or the system, it is 

necessary to wait for the water temperature to reach 40° 

C. When putting water into the system, always run the 

circulation pump to prevent breaking the elements.

 

9

When the boiler is off for a long period or when carrying out 

repairs, maintenance or cleaning, the electrical supply must 

be disconnected using the master switch.

 

9

Especially in summer, when the boiler is off for a long period, 

to avoid problems of incrustation in the circulation pumps, 

the boiler must be switched on 1-2 times a month and the 

circulation pumps operated for at least 5 minutes. Limescale 

in the water can cause problems if the pump is unused for 

a long period.

 

9

Choose a boiler with the right dimensions for the project 

in full compliance with applicable regulations. If the wrong 

size is chosen, the performance will suffer.

 

9

The RTT 29-79 boilers are only to be used for heating. For the 

production of domestic hot water, it is necessary to use a 

storage heater or another heat exchanger. For it to operate 

efficiently, pay special attention to the size of the domestic 

hot water circuit.

 

9

The RTT 29-79 boilers are delivered without the burner. To 

choose the most suitable burner and keep the performance 

high, contact our technical personnel.

 

9

If the boiler goes into lockout automatically because of 

overheating, do not put cold water inside to get it going 

again. Wait until the boiler cools down, and try to restart 

it. If this does not happen, contact the Technical Assistance 

Service.

 

9

Periodically check the boiler and the burner. If these periodic 

checks are not carried out, the performance will worsen and 

there will be an increase in fuel consumption. The periodic 

and annual controls of the boiler should be carried out 

precisely and at the pre-established time. Natural gas is a 

clean fuel and does not dirty the appliance so much. Liquid 

fuel burners, on the other hand, dirty the appliance a lot, 

and the boiler controls and maintenance operations are 

necessary to ensure a high performance and a long life.

 

9

Repairs and periodic controls of the boilers RTT 29-79 should 

be carried out by specialised technicians. This manual 

contains an explanation of the user's responsibilities and 

the information required for using the boiler. Beyond these 

operations, the boiler should only be commissioned by the 

user or by one of our technicians. Do not try to adjust the 

boiler or tamper with any components.

 

9

The mains electrical connections to the boiler room, to the 

burner and to the boiler itself, the earthing of the control 

Содержание RTT 29

Страница 1: ...cod Doc 0079317 rev 0 03 2016 RTT 29 79 EN INSTRUCTIONS FOR THE INSTALLER AND FOR THE TECHNICAL ASSISTANCE CENTRE...

Страница 2: ...cally capable of carrying out routine maintenance keep it running at maximum efficiency with low running costs and which has original spare parts if required This instruction booklet contains importan...

Страница 3: ...Instructions for use 13 1 20 Conveyance and discharge of the boiler water 13 1 21 Instructions for disposing of the product 13 1 22 Fire prevention regulations for the boiler room 14 1 23 Controls and...

Страница 4: ...peciallyinsummer whentheboilerisoffforalongperiod to avoid problems of incrustation in the circulation pumps the boiler must be switched on 1 2 times a month and the circulation pumps operated for at...

Страница 5: ...er increases The RTT 29 79 boilers are made of EN GJL 200 a special alloy that resists expansion and temperature variations which ensures a long working life Thanks to the vertical structures that hav...

Страница 6: ...mm Water input output coupling G 1 1 4 DN Boiler volume gas side 24 20 33 40 42 60 51 80 61 00 70 20 dm3 lt 0 024 0 033 0 043 0 052 0 061 0 070 m2 Combustion chamber volume gas side 16 94 23 38 29 82...

Страница 7: ...ER RTT 39 BOILER RTT 49 BOILER RTT 59 BOILER RTT 69 BOILER RTT 79 M mm 540 640 740 840 940 1 010 502 840 L M 1 6 Delivery The RTT 29 79 boilers are mounted on a wood pallet wrapped with Pluriball and...

Страница 8: ...for the installation of the burner of the boiler Characteristics of the base it should be made of BS 25 fibre concrete it should respect the indicated dimensions it should not be covered with a slipp...

Страница 9: ...ciently adequate conditions for the boiler room the hydraulic pipes and the other com ponents of the system 9 9Follow the instructions of the local gas suppliers 1 9 Hydraulic system Limescale and oth...

Страница 10: ...ic diagram system for heating and domestic hot water production 1 11 Instructions for the connection of the fuel tank The dimensions of the fuel tank support structure should be ad equate for the dime...

Страница 11: ...come under 0 5 m sec limit 2 m sec in the advised speed 1 13 Standard control panel of the boiler 1 Main ON OFF switch 2 Boiler thermostat from 30 to 90 C 3 Boiler thermometer 4 Safety thermostat with...

Страница 12: ...3 41 4 91 6 00 8 63 5 25 7 56 7 53 10 85 10 22 14 72 12 91 18 59 Height of combustion gas pipe liquid fuel m 7 67 18 85 13 49 33 17 11 82 29 06 16 95 41 67 23 00 56 55 29 05 71 43 If the fuel is natu...

Страница 13: ...erruption of current other faults or when the pumps are stopped protection pumps etc the burner should switch off The system should do this automatically Carry out the electrical wiring taking into ac...

Страница 14: ...cal system All the boiler s gas and water valves should be open 9 9Check all the other connections according to the system s options 1 24 Boiler start up Engage the electrical supply using the master...

Страница 15: ...nnection of the sensors Boiler combustion chamber and any formations of soot in the fume passages cleaning after checking Fastening and seal of the boiler door Seals of the boiler fittings Correct ope...

Страница 16: ...ation When assembling the burner be careful not to leave any empty space between the front door and the body of the burner All the points of contact should be covered with insulating material to preve...

Страница 17: ...EL BURNER BOILER BURNER MODEL CODE BOILER RTT 29 R40 D08 3481701 RTT 39 BOILER R40 D08 3481701 RTT 49 BOILER R40 D08 3481701 RTT 69 BOILER R40 D17 3482601 RTT 79 BOILER R40 D17 3482601 GAS BURNER BOIL...

Страница 18: ...sealant wax silicon compounds For the measurements of the connection for the flue gases dis charge system see pag 8 1 34 Transport and storage The manufacturer transports the boiler on a pallet fixin...

Страница 19: ...rmation Retailer Mr Address Tel Technical Assistance Centre Mr Address Tel Installer Mr Address Tel Date Intervention Fuel supplier Mr Address Tel Date Qty supplied Date Qty supplied Date Qty supplied...

Страница 20: ...go VR Tel 0442630111 Fax 044222378 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may...

Отзывы: