INSTALLAZIONE

 

 

9

NOTICE:

 

− Loss of water from the system, and the consequential need 

to add water, can be caused not only by leaks from the 

circuit, but also from the incorrect sizing of the expansion 

vessel or precharge pressure. (If normal thermal expansion 

causes pressure in the system to increase beyond the set-

ting of the safety valve, that safety valve will open conti-

nuously.)

 

− The expansion vessel size should be corrected to prevent 

unnecessary safety valve blow-off.

The heating system should not need any further topping up once 

it is filled and bled of all air.

Any top-ups need to be monitored (by a meter), treated and re-

corded in the heating system’s technical log. The presence of a 

water softener in conjunction with an automatic filling system is 

not sufficient to ensure proper performance.

If more than one boiler is installed in a large system, all boilers 

must be switched on at the same time to ensure that any possible 

limescale formation is uniformly distributed.

2.6.6 

Reconditioning old heating systems

Frequent mistakes and necessary precautions.

If a boiler must be replaced, do not refill the entire central heating 

circuit if the quality of water in it conforms to requirements.

If the quality of water fails to conform to requirements, either re-

condition the old water or separate the water circuits (water in the 

boiler circuit must conform to requirements).

Conclusions

Never forget that proper water conditioning and proper heating 

system design not only guarantee safety and security but also en-

sures significant savings in maintenance costs and overall thermal 

efficiency.

2.6.7 

Elimination  air  and  gas  from  central  heating 
system

When designing new heating systems, it is necessary to eliminate 

the air and other gases that form in the system.

Recently added fill or top-up water loses much of its volume in 

the first few days because it releases gases. With new systems you 

should therefore initially check the heating water pressure on a 

daily basis, and then at gradually longer intervals. Air and gas in 

the water system not only causes the corrosion problems listed 

above, but also reduces thermal efficiency, causing pump failu-

re  and  noise  and  vibration  throughout  the  heating  system.  Air 

bubbles and gas inevitably form in heating circuits during normal 

functioning, especially if the precautions listed above are not fully 

respected.

In particular:

 

− as temperature increases, oxygen becomes less watersolu-

ble and bubbles begin to form;

 

− CO2 (carbon dioxide) is generated as the carbonates of cal-

cium and magnesium precipitate out;

 

− the chemical oxidation of the metals in the system also ge-

nerates hydrogen.

These gases must be eliminated as they are formed. The system 

needs to be designed and installed so that all gases can be vented 

quickly, easily, and effectively.

2.6.8 

Use of Antifreeze

Do  not  use  automotive  silicate-based  antifreeze  in  the  heating 

system.

In areas where freezing may occur, an antifreeze may be added 

to the system water as protection. Please adhere to the specifica-

tions provided by the antifreeze manufacturer.

 

− Use the anti-freeze manufacturer’s data to determine the 

anti-freeze ratio for the desired freeze protection tempe-

rature.

 

− Do not exceed 50% antifreeze mix ratio and do not use an-

tifreeze other than specifically made for hot water heating 

systems.

 

− the chemical oxidation of the metals in the system also ge-

nerates hydrogen.

Содержание RTC Series

Страница 1: ...cod 20112713 rev 6 08 2017 RTC 3000 4000 5000 6000 RTC 8000 10000 RTC IT ISTRUZIONI PER IL RESPONSABILE DELL IMPIANTO PER L INSTALLATORE E PER IL SERVIZIO TECNICO DI ASSISTENZA...

Страница 2: ...o fornirLe le informazioni che ri teniamo necessarie per una corretta e pi facile installazione dell apparecchio senza voler togliere nulla alla Sua competenza e capacit tecnica Buon lavoro e rinnovat...

Страница 3: ...g old heating systems 22 2 6 7 Elimination air and gas from central heating system 22 2 6 8 Use of Antifreeze 22 2 7 Impianti idraulici di principio 23 2 8 Evacuazione della condensa 30 2 9 Neutralizz...

Страница 4: ...9 9In caso di fuoriuscite d acqua scollegare la caldaia dalla rete di alimentazione elettrica e chiudere l alimentazione idrica 9 9Verificareperiodicamentechelapressionedieserciziodell im pianto idrau...

Страница 5: ...or death from fire Do not use flammable or combustible material in the boiler room It is recommended not to store any items within 16 inches 415mm of the appliance 9 9CAUTION Appliance damage from co...

Страница 6: ...L apertura del portello anteriore ambidestra ed possibile an che senza togliere il bruciatore L apertura di fabbrica da sinistra a destra ma pu essere modificata in base alle necessit in in stallazion...

Страница 7: ...ruciatore 2 Visore fiamma con presa di pressione 3 Portello 4 Pannellatura 5 Mandata impianto 6 Attacco valvola di sicurezza 7 Ritorno impianto AT 8 Camera di combustione 9 Ritorno impianto BT 10 Cass...

Страница 8: ...esa di pressione 3 Portello 4 Pannellatura 5 Mandata impianto 6 Attacco valvola di sicurezza 7 Ritorno impianto AT 8 Camera di combustione 9 Ritorno impianto BT 10 Cassa fumi 11 Raccordo canale da fum...

Страница 9: ...low GPM 360 550 650 750 1150 1250 Water Volume gal 354 420 489 597 951 1255 Water Pressure Drop 1 7 psi at 300GPM 0 7 psi at 400GPM 0 6 psi at 500GPM 1 3 psi at 600GPM 1 1 psi at 800GPM 0 8 psi at 100...

Страница 10: ...afety limits Value Maximum allowable temperature 210 F 99 C Maximum Allowable Working Pressure MAWP 160 psi 11 bar Maximum cycle time for safety tempe rature limiter 40 s Maximum cycle time for temper...

Страница 11: ...n accordance with national regulations with a content of elementary sulphur 1 5 ppm and volatile sulphur 50 ppm Ultra Low Sulphur Diesel in accordance with national regu lations with a content of elem...

Страница 12: ...LO RTC 3000 RTC 4000 RTC 5000 RTC 6000 RTC 8000 RTC 10000 GAS RS100 M x x RS130 M x x RS190 M x x RS100 E x x BRUCIATORI BOILERS MODELLO RTC 3000 RTC 4000 RTC 5000 RTC 6000 RTC 8000 RTC 10000 RS130 E...

Страница 13: ...able are shown the codes for the upper door kit that shall be ordered as accessory for some matching boiler bur ner BRUCIATORI BOILERS MODELLO RTC 3000 RTC 4000 RTC 5000 RTC 6000 RTC 8000 RTC 10000 RX...

Страница 14: ...pleta degli accessori di montaggio pro tetta da un imballo in cartone e da una gabbia di legno 9 9Il libretto di istruzione parte integrante dell apparecchio e quindi si raccomanda di recuperarlo di l...

Страница 15: ...RTC 5000 RTC 10000 non sono posizionati su un pallet A rimuovere le viti di fissaggio al pallet mod RTC 3000 RTC 4000 e posizionare la caldaia nel luogo stabilito 0 0 vietato disperdere nell ambiente...

Страница 16: ...ght of the lid of the system s condensate neutralizer The gas supply pipe should be installed in such away that the boi ler s paneling can be removed and the front door opened without having to remove...

Страница 17: ...3 150 3 150 4 150 4 150 6 150 6 150 DN 3 Ritorno BT 4 150 6 150 6 150 6 150 8 150 8 150 DN 4 Attacco valvola di sicurezza 2 NPT 2 NPT 2 NPT 2 NPT 2 NPT 2 NPT DN 5 Scarico condensa 1 1 4 NPT 1 1 4 NPT...

Страница 18: ...m 7 5 190mm 2 5 63mm 7 5 190mm 2 5 63mm 7 5 190mm 3 LWCO 1 2 NPT 2 5 63mm 3 5 89mm 2 5 63mm 3 5 89mm 2 5 63mm 3 5 89mm 2 5 63mm 3 5 89mm 4 Drum temp LF Hold 1 2 NPT 2 5 63mm 4 5 110mm 2 5 63mm 4 5 110...

Страница 19: ...NPT 2 5 63mm 9 5 240mm 2 5 63mm 9 5 240mm 3 LWCO 1 2 NPT 2 5 63mm 3 5 89mm 2 5 63mm 3 5 89mm 4 Drum temp LF Hold 1 2 NPT 2 5 63mm 3 5 89mm 2 5 63mm 3 5 89mm 5 Inlet operating temperature sensor 1 2 NP...

Страница 20: ...co Portata Perdita di carico GPM psi GPM psi GPM psi GPM psi RTC 3000 276 1 48 184 0 82 138 0 55 92 0 33 RTC 4000 368 0 61 245 0 38 184 0 28 123 0 18 RTC 5000 460 0 56 307 0 34 230 0 25 153 0 16 RTC 6...

Страница 21: ...ating system includes an open expansion vessel then the boiler itself must be separated from the heating system by means of a heat exchanger Se la durezza dell acqua di partenza supera il valore indic...

Страница 22: ...iciency 2 6 7 Elimination air and gas from central heating system When designing new heating systems it is necessary to eliminate the air and other gases that form in the system Recently added fill or...

Страница 23: ...o condi zionate con opportuni sistemi di trattamento Come valori di riferimento possono essere considerati quelli riportati nella tabella del paragrafo Requisiti qualitativi dell acqua 0 0 vietato far...

Страница 24: ...re impianto 5 Valvole non ritorno 6 Valvola di sfiato automatico 7 Valvola di sicurezza caldaia 7 Seconda valvola di sicurezza caldaia solo per RTC 8000 RTC 10000 8 Rubinetto di scarico caldaia 9 Filt...

Страница 25: ...zionamento 4 Circolatore impianto 5 Valvole non ritorno 6 Valvola di sfiato automatico 7 Valvola di sicurezza caldaia 7 Seconda valvola di sicurezza caldaia solo per RTC 8000 RTC 10000 8 Rubinetto di...

Страница 26: ...mento 4 Circolatore impianto 5 Valvole non ritorno 6 Valvola di sfiato automatico 7 Valvola di sicurezza caldaia 7 Seconda valvola di sicurezza caldaia solo per RTC 8000 RTC 10000 8 Rubinetto di scari...

Страница 27: ...atore impianto 5 Valvole non ritorno 6 Valvola di sfiato automatico 7 Valvola di sicurezza caldaia 7 Seconda valvola di sicurezza caldaia solo per RTC 8000 RTC 10000 8 Rubinetto di scarico caldaia 9 F...

Страница 28: ...mpianto 5 Valvole non ritorno 6 Valvola di sfiato automatico 7 Valvola di sicurezza caldaia 7 Seconda valvola di sicurezza caldaia solo per RTC 8000 RTC 10000 8 Rubinetto di scarico caldaia 9 Filtro a...

Страница 29: ...latore impianto 5 Valvole non ritorno 6 Valvola di sfiato automatico 7 Valvola di sicurezza caldaia 7 Seconda valvola di sicurezza caldaia solo per RTC 8000 RTC 10000 8 Rubinetto di scarico caldaia 9...

Страница 30: ...azione tale da evitare qualsiasi accumulo di conden sa Pcc in inch W C 1 3 3 7 2 9 Neutralizzazione della condensa raccomandato installare sempre un kit di neutralizzazione della condensa Nella tabell...

Страница 31: ...2 towards the boiler All condensate should be treated through a neutralization media before being eliminated to the floor drain 3 2 3 1 RTC 3000 RTC 4000 RTC 5000 RTC 6000 e A RTC 8000 RTC 10000 e A...

Страница 32: ...getation Vertical Terminations Roof penetrations should follow all appliance codes and the vent manufacturer s instructions The vent should never be installed at less than the required clearances to c...

Страница 33: ...all be located as follows top louver shall start within 12 of the ceiling and the bottom louver within 12 of the floor as prescribed in NFPA 54 2 10 5 Condensate Removal The exhaust vent pipe must be...

Страница 34: ...ste in fabbrica con il portello che si apre da sinistra verso destra Qualora sia necessaria l apertura nel sen so opposto operare come segue dopo aver rimosso il pannello laterale Portello RTC 3000 RT...

Страница 35: ...rniera superiore Allentare il dado 4 e rimuovere l anello elastico 5 Rimuovere il perno passante 6 4 6 5 Rimuovere i quattro dadi 7 ed estrarre la staffa 8 8 7 Operando in maniera inversa a quanto des...

Страница 36: ...opportune di mensioni secondo la legislazione vigente nel paese di in stallazione stringere nuovamente il dado con rondella 1 sul punto di connessione collegare l altra estremit del filo di messa a t...

Страница 37: ...ei passacavi ovali del quadro di comando Il quadro di comando non fornito a corredo 3 2 Agganciare i pannelli laterali 2 3 4 5 6 7 ai longheroni superiori 1 della caldaia facendo attenzione a far entr...

Страница 38: ...ella pannellatura procedere come riportato in seguito Aprire le asole pretranciate poste sul pannello laterale 3 o 4 a seconda del lato su cui si desidera installare il quadro di comando in corrispond...

Страница 39: ...ssare n 8 perni AVP sui fori della parte anteriore dei pan nelli 9 10 11 12 due per pannello e montare i pannelli su periori 11 9 10 12 Agganciare il pannello posteriore superiore 13 nei perni predisp...

Страница 40: ...oli la teralmente e agganciandoli sui perni dei pannelli superiore e inferiore 15 16 Montare il profilo anteriore 17 agganciandolo sui perni dei pannelli superiori 17 2 14 Accessorio supporto quadro e...

Страница 41: ...emperature and low temperature For an optimum energy yield we recommend supplying a flow rate of 10 of the total nominal flow rate via the low temperature flange with a return temperature below the de...

Страница 42: ...slowly and observe the pressure gauge whilst doing so Vent the heating system via the radiator air vent valves If the water pressure drops as a result of venting the system Top up the system with wat...

Страница 43: ...tightness Start the burner Complete the burner test report regarding the individual output stages Conduct a tightness test on the hot gas side After a short time in operation tighten the screws in th...

Страница 44: ...system re mains operational especially when there is a risk of frost 9 9NOTICE Always keep the oil supply valve shut off if the burner is shut down for an extended period of time 4 1 Shutting down th...

Страница 45: ...commencing any main tenance The results of flue gas analysis can give a clear idea of what servi cing or repairs are needed 5 3 Apertura portello Per aprire il portello sufficiente svitare completamen...

Страница 46: ...n the heating sy stem The fill and top up water quality must comply with the water re quirements in this manual Air pockets may form in the heating system through the fill or top up water releasing ga...

Страница 47: ...lmente la caldaia prima di aprire le aperture di ispezione Le aperture di ispezione sono situate nei seguenti punti Modelli RTC 3000 RTC 4000 RTC 5000 RTC 6000 2 1 1 Ispezione 2 Ispezione e scarico fa...

Страница 48: ...if requi red Check and clean the burner Visual inspection and remove any conta mination Check all safety equipment safety shut down Function check Flue gas analysis with test report for each output s...

Страница 49: ...e circuit Check the vent valve The boiler has reached the set tempera ture but the radiators are still cold Air in the circuit Bleed the circuit Pump malfunctioning Check release the pump Problem with...

Страница 50: ...t the environment we use the best possible technology and materials taking into account economic points of view Packaging For the packaging we participate in the country specific recycling systems whi...

Страница 51: ...51...

Страница 52: ...setts U S A 02043 2165 Meadowpine Blvd Mississauga Ontario Canada L5N 6H6 www rielloboilers com Poich l Azienda costantemente impegnata nel continuo perfezionamento di tutta la sua produzione le carat...

Отзывы: