20159575
18
GB
Installation
5.9.2
Gas train
Type-approved in accordance with EN 676 and supplied
separately from the burner.
To select the correct gas train model, refer to the manual "Burner-
gas train combination" supplied with the unit.
5.9.3
Gas train installation
The gas train must be connected to the gas connection 1)
(Fig. 22), using the flange 2), the gasket 3) and the screws 4)
supplied with the burner.
The train can enter the burner from the right or left side,
depending on which is the most convenient, see Fig. 22.
5.9.4
Gas pressure
indicates the pressure drops of the combustion head on the ba-
sis of the burner operating output.
Tab. F
The values shown in refer to:
–
Natural gas G 20 NCV 9.45 kWh/Sm
3
(8.2 Mcal/Sm
3
)
–
Natural gas G 25 NCV 8.13 kWh/Sm
3
(7.0 Mcal/Sm
3
)
DANGER
Disconnect the electrical power using the main
switch.
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Make sure that the gas train is properly installed
by checking for any fuel leaks.
The operator must use the required equipment
during installation.
Fig. 22
D505
kW
1
p (mbar)
2
p (mbar)
G 20
G 25
G 20
G 25
RS 45
/M C05
90
3.4
5.1
0.4
0.6
143
5.1
7.7
0.6
0.9
197
7.3
10.8
0.8
1.2
250
9.3
13.9
1.0
1.5
303
11.1
16.6
1.2
1.8
357
12.5
18.7
1.4
2.1
410
13.7
20.5
1.5
2.3
463
15.0
22.4
1.7
2.5
517
16.9
25.2
1.9
2.8
570
20.0
29.8
2.2
3.3
ATTENTION
Data of head thermal power and gas
pressure refer to operation with gas
butterfly valve fully open (90°).
Содержание RS 45/M C05
Страница 2: ...Translation of the original instructions ...
Страница 38: ...20159575 36 GB Appendix Electrical panel layout ...
Страница 40: ...20159575 38 GB Appendix Electrical panel layout 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 2 3 4 5 6 6 ...
Страница 42: ......
Страница 43: ......