
20062968
16
Installation
4.3
Preliminary checks
Checking the consignment
4.4
Operating position
4.5
Securing the burner to the boiler
4.5.1
Boiler plate
Make holes in the plate shutting off the combustion chamber, as il-
lustrated in Fig. 11.
The position of the threaded holes can be marked using the ther-
mal insulation screen supplied with the burner.
Tab. J
CAUTION
After removing all the packaging, check the integrity
of the contents. In the event of doubt, do not use the
burner; contact the supplier.
The packaging elements (wooden cage or card-
board box, nails, clips, plastic bags, etc.) must not
be abandoned as they are potential sources of dan-
ger and pollution; they should be collected and dis-
posed of in the appropriate places.
WARNING
The burner output must be within the boiler's firing
rate.
WARNING
A burner label, or any other component, that has
been tampered with, removed or is missing, pre-
vents the definite identification of the burner and
makes any installation or maintenance work difficult
WARNING
The burner is designed to operate only in posi-
tions
1
,
2
,
4
and
5
Installation
1
is preferable, as it is the only one
that allows the maintenance operations as
described in this manual.
Installations
2
,
4
and
5
allow operations to be
performed, but make maintenance and inspec-
tion of the combustion head more difficult.
DANGER
Any other position could compromise the cor-
rect operation of the appliance.
Installation
3
is prohibited for safety reasons.
2
3
4
5
1
D7739
Fig. 10
inch
A
B
C
RS 120/EV LN
7
21/32“
10
13/16“
- 12
25/32“
1/2 W
Fig. 11
D455
Содержание RS 120/EV LN
Страница 2: ......
Страница 38: ...20062968 36 Appendix Spare parts A Appendix Spare parts ...
Страница 42: ......
Страница 43: ......