
5144
2
DIMENSIONS
WORKING RANGE
PRESSURE IN THE COMBUSTION CHAMBER - 2
nd
STAGE OUTPUT
MINIMUM GAS PRESSURE - 2
nd
STAGE OUTPUT
Pressure
: measured at the test point with combustion chamber at 0 mbar.
Boiler front-plate
drilling
* Extension that you can obtain with special extended head (to be requested separately).
Burner
160
160
165
M10
410
645
187
*
320
437
97
332
165
Rp 1
1/2
D1785
S7564
S7565
ø 155
Kcal/h
mbar
kW
Min output at 1
st
stage 174 kW - 15 Kg/h
S7596
Kcal/h
mbar
kW
Gas pressure test point
Natural gas
LPG
S7536
S7597