OIL SUPPLY  

S7542

S7541

Please note: 
all oil lines must be airtight. 
We suggest copper-piping. Level as the suction
pipe, then a none return valve is not required
and the section-pipe can be disconnected with-
out causing any problems.

H = Margin;

 L = Inlet-pipe’s length, including the vertical line.

The copper pipes with diameter 8 and 10, shown in the schemes, can be replaced with 1/4 and 3/8
steel pipes, commercial gas without welding.

H

L

m

m

Øi 8

Øi 10

0.5

5

10

1

10

20

1.5

15

30

2

20

40

H

L

m

m

Øi 8

Øi 10

0

32

70

0.5

28

62

1

24

55

1.5

20

48

2

16

40

3

7

25

3.5

10

H

max. 4m

H

max. 4m

H

Содержание GI/EMME 400

Страница 1: ...2915143 6 Installation use and maintenance instructions Dual fuel Gas Oil Gas burner MODEL TYPE GI EMME 400 496 T80...

Страница 2: ......

Страница 3: ...8A 220 V Secondary 30 mA 1x8 kV Pump Output 55 kg h at 12 bar max pressure 15 bar Operation Two stages Fig 1 EQUIPMENT Quantity Burner accessories 1 Gas train s gasket 8 Screws 1 Insulating screen 3 S...

Страница 4: ...with combustion chamber at 0 mbar Boiler front plate drilling Extension that you can obtain with special extended head to be requested separately Burner 160 160 155 M10 410 610 187 320 397 97 292 165...

Страница 5: ...e boiler s plate 6 interposing gasket 5 Mount the group A to the boiler front Fit the nozzles and regulate the combustion head as speci fied below S7539 6 5 4 1 3 2 B A 1 Gas supply pipe 7 Min gas pre...

Страница 6: ...be disconnected with out causing any problems H Margin L Inlet pipe s length including the vertical line The copper pipes with diameter 8 and 10 shown in the schemes can be replaced with 1 4 and 3 8...

Страница 7: ...aker CO Selector switch MB Burner terminal strip MP Pump motor MV Fan motor PA Air pressure switch RT Thermal relay SM Servo motor TA Ignition transformer TB Burner earth UV Probe U V V1 1 stage valve...

Страница 8: ...control system PC Check pressure switch PG Min gas pressure switch TB Burner earth NOTICE The electric wiring carried out by the installer must be in compliance with the rules in force in the country...

Страница 9: ...IN gland Pg 13 5 for sheath 13 To guarantee the IP 40 protection level in accordance to CEI 70 1 seal the glands that are not used NOTES Do not exchange Neutral with Phase avoid a plug socket connecti...

Страница 10: ...s to holes F Nozzle 1 2 1 2 kg h bar GPH kg h GPH kg h 12 2 50 9 7 2 50 9 7 19 4 10 12 3 00 3 00 10 8 11 7 3 00 3 00 10 8 11 7 21 6 23 4 10 12 3 50 3 50 12 6 14 0 3 50 3 50 12 6 14 0 25 2 28 0 10 12 4...

Страница 11: ...lever The orange lever controls the air damper position for the first flame it is adjustable both for opening and closing 2nd STAGE Red and black levers The red lever controls the air damper position...

Страница 12: ...fuel In the other two situations start up the burner bleed the air of manometer joint 8 P fig 1 if you have a lock out repeat the cycle ATTENTION Before starting up the burner check that the return p...

Страница 13: ...e a microammeter of 100 A c c connected to the photocell as in the scheme with a capacitor of 100 F 10V c c at the same level of the instrument BURNER STARTING UP PROGRAMME If during the work the flam...

Страница 14: ...The air pressure switch does not effect a selection because of a fault contact insufficient air pressure LOCK HALT Malfunctions of the flame detection circuit photo sensitive cell exhausted fault inte...

Страница 15: ......

Страница 16: ...RIELLO S p A Via degli Alpini 1 I 37045 Legnago VR Tel 39 0442 630111 Fax 39 0442 630375 Con riserva di modifiche...

Отзывы: