background image

8

gENERAL

gENERAL

LocATIoN oF SENSoRS

R

 

7200/1 Plus

 storage cylinders are equipped with dedicated sockets for the storage cylinder TEMPERATURE gAUgE or TEMPERATURE 

SENSoR.

 

9

The installer is responsible for making all necessary connections to the boiler and solar collectors. Installers must use their 

expertise to ensure proper installation and functioning in compliance with all applicable legislation.

Psr

B

A

C

A

 

Temperature sensor socket

B

 

Temperature sensor

C

 guide

Psr

 

Solar controller temperature sensor socket

 

9

Joins between temperature sensor cables and control panel extension cables must be soldered and protected by sheaths or 

other forms of electrical insulation.

Содержание 7200/1 170 Plus

Страница 1: ...cod 20073794 rev 1 08 2015 7200 1 170 Plus EN INSTALLER Technical Assistance Service AND USER MANUAL ...

Страница 2: ...ge cylinder efficient and cheap to run R service centres also stock any original spare parts that might be required This manual contains important instructions and precautions that must be observed to ensure the trouble free installation and efficient functioning of your R solar storage cylinder Please accept our renewed thanks for your purchase Riello S p A Conformity R storage cylinders conform ...

Страница 3: ...ecifications 6 7 Water circuit 7 8 Location of sensors 8 9 Overall dimensions and water fittings 9 INSTALLER 10 Unpacking the product 10 11 Handling 10 12 Place of installation 11 13 Installation in older systems and systems requiring modernisation 11 TECHNICALASSISTANCE SERVICE 14 Putting into service 11 15 Temporary shutdown 12 16 Preparing for extended periods of disuse 12 17 Maintenance 12 18 ...

Страница 4: ...d must be mixed with water in a percentage varying from 30 to 50 as instructed in the installation and maintenance manual for the R solar collectors 9 9Only fill the solar collector primary circuit with water and glycol premixed in the percentages specified in the R installation and maintenance manual 9 9This instruction manual is an integral part of the product It must be kept safe and must ALWAY...

Страница 5: ... Legnago VR ITALY bar V Hz l COLLEGAMENTO DI TERRA OBBLIGATORIO RACCORDEMENT A LA TERRE OBLIGATOIRE OBLIGATORY GROUND CONNECTION W kW Portata specifica sup T 35 C Débit specifique sup T 35 C Domestic Hot Water production T 35 C l 1 Massima potenza assorbita sup T Primario 80 C Puissance absorbée serpentin sup T Primaire 80 C Power absorbed by top coil T primary 80 C Press esercizio max Pression se...

Страница 6: ...y 4 8 l Coil heat exchange surface area 0 78 m2 DHW production T 35 C Primary coil at 80 C 585 l h Primary coil at 88 C 645 l h NL performance factor 1 7 Heat loss in 24h 2 4 kWh 24h Maximum working pressure of coils 10 bar Maximum working pressure of storage cylinder 10 bar Maximum operating temperature 99 C Net weight with insulation 65 kg Heat loss according to EN 12897 2006 at T 45 C 100 W Ene...

Страница 7: ... SCo Collector probe Note The above schematic is purely indicative 9 9R 7200 1 Plus storage cylinders are delivered without a boiler heating pump A suitably rated pump must be provided and installed separately Flow rate from the solar collector circuit depends on the type and number of collectors installed For further information consult the manual for the collectors 9 9The domestic hot water syst...

Страница 8: ...ons to the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B Temperature sensor C Guide Psr Solar controller temperature sensor socket 9 9Joins between temperature sensor cables and control panel extension cables must be soldered and protected by sheaths...

Страница 9: ...orage cylinder drain 1 F Ø Psr Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 mm TR Temperature gauge DSA Sensor power cable entrance ICP Rear cable entrance A 890 mm B 590 mm C 525 mm D 335 mm E 605 Ø mm F 640 mm G 170 mm H 360 mm I 250 mm L 985 mm N 1145 mm 9 9We recommend that yo...

Страница 10: ...not on hand to lift the storage cylinder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is able to support the weight of the storage cylinder Remove the brackets 1 then carefully rotate and slide the storage cylinder off the pallet on to the platform Make sure that the storage cylinder is ...

Страница 11: ... ions none Ammonia ions none Silicon ions less than 30 ppm Technical Assistance Service 14 Putting into service It is essential to perform the following checks before starting up or testing the functioning of the storage cylinder In particular check that The supplycocks in the domesticwatercircuit are all open The water connections to the solar storage cylinder s valve group have been made correct...

Страница 12: ...hnical Assistance Service or by a qualified heating engineer at least once a year Perform the following operations before beginning any maintenance Switch the electricity supply to the storage cylinder s valve group and to any associated boiler OFF at the main switch and at the control panel Close the shut off cocks for the domestic hot water circuit Drain the storage cylinder s DHW secondary wate...

Страница 13: ...Fit a pressure limiter Fit a flow reducer There are blockages or deposits in the domestic hot water circuit Check and clean as necessary The pump is malfunctioning Check the pump The water temperature from the boiler is too low Check the temperature setting There is air in the primary circuit Bleed the circuit SOLAR COLLECTOR CIRCUIT FAULT CAUSE SOLUTION The storage cylinder functions incorrectly ...

Страница 14: ...uce impact on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the storage cylinder s thermostat to its minimum temperature 9 9If outdoor temperature may drop below ZERO risk of freezing performtheoperationsdescribedinthe Preparing for extended periods of disuse section 23 Preparing for extended p...

Страница 15: ...15 END USER END USER ...

Страница 16: ...Tel 0442630111 Fax 044222378 www riello it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liable to modification without notice ...