25
INSTALLATION
2.13
Electrical connections
The
INSIEME EVO 32 BS/100 LN
boiler is fully cabled in the factory.
The only connections required for its installation are those of
the mains power supply, room thermostat and other optional
system components.
Proceed as follows to access the control panel terminals:
− Remove the front and top panels (A) and (B) from the
boiler casing;
A
B
− loosen the two two screws (C) securing the instrument
panel to the casing of the control panel;
C
− open the door (D) and rotate the instrument panel (E)
outwards;
E
D
− to facilitate electrical connections, remove the two
screws (F) and remove the terminal holder (G) from the
casing (H);
F
G
H
− route cables from outside through the cable guides pro-
vided;