13
In order to maintain efficient operation of
the compressor system, check the air fil-
ter weekly (per maintenance schedule),
oil level and gasoline level before each
use. The ASME safety valve should also
be checked weekly. Pull ring on safety
valve and allow the ring to snap back to
normal position. This valve automatically
releases air if the tank pressure exceeds
the preset maximum. If air leaks after the
ring has been released, or the valve is
stuck and cannot be actuated by the ring,
the ASME safety valve MUST be
replaced.
With engine OFF, clean debris from
engine, flywheel, tank, air lines and
pump cooling fins.
Maintenance
Release all pressure from the
system before attempting to
install, service, relocate or per-
form any maintenance.
Do not attempt to tamper with
the ASME safety valve!
Operation
Daily
Weekly
Monthly 3 Months
Check Oil Level
l
Drain Tank
l
Check Air Filter
l
Check Safety Valve
l
Blow Dirt From Unit
l
Check Belt Tightness
l
Change Oil
l
Maintenance Schedule
Содержание GP90150A
Страница 19: ...19 Notes ...
Страница 22: ...22 Repair Parts 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 11 7 22 ...
Страница 46: ...Sp22 Piezas de repuesto 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 11 7 22 ...
Страница 70: ...Pièces de rechange Fr22 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 11 7 22 ...