2
Quick-Opening Die Head Instruction Sheet
UNDER (small er thread diameter, more turns of fitting
engage ment) mark ings.
5. Tighten clamp lever.
Threading
Install the Die Head per the threading machine instructions.
Move the die head into threading position. Move the throwout
lever to CLOSE position.
Following the
instructions for the Threading Machine, thread the
stock.
Opening the Die Head at the End of the
Thread
At the end of the thread:
• Pipe Threads – End of pipe is flush with the end of the
number 1 die.
• Bolt and Straight Threads – Thread the desired length –
watch closely for any interference between the parts.
Move the throwout lever to the OPEN position, retracting dies.
Do not run machine in reverse (REV) with dies engaged.
Turn machine OFF per the instructions.
99 Washington Street
Melrose, MA 02176
Phone 781-665-1400
Toll Free 1-800-517-8431
Visit us at www.TestEquipmentDepot.com