4.2 Installation
The conditions and starting points that follow are applicable for installation. Make sure that the
working conditions comply with the, local or national, laws and regulations.
•
Do not remove the product from the packaging until a short time before the installation.
•
Use the correct work equipment and accessories (belts, chains, pallets or such) if it is not
permitted or possible to put the product manually in position.
•
Ridder installed the RLL400 control-unit on a RW motor gearbox.
•
Only use a permitted mounting position when you install the RW motor gearbox with control-
unit. Refer to the product manual of the used RW motor-gearbox at
•
The RLL400 gives information about the system with LEDs on the control board. Thus, easy access
and a satisfactory view is recommended for the location of the RLL400.
5. CONNECT INSTRUCTIONS
Only to approved personnel it is permitted to do the connect instructions.
Removal cover
•
Remove the bolts (8x) and the cover temporarily to do all necessary work. The gasket usually
stays in its position.
•
Make sure that no damage is caused to the gasket and that it does not become dirty. To prevent
this remove the gasket (carefully) if necessary.
•
Install the cover again after the work! Refer to the end of chapter 7.
5.1 Electrical material
A minimum conductor diameter of
1.5 mm²
is applicable to the cables in the wiring diagrams. For
the used components, electrical material and cable lengths the necessary conductor diameter can
be different.
Make sure that the drive unit is installed in a stable condition. The
structure must have sufficient strength for the applied forces.
Make sure that easy access to the cover of the RLL400 control-unit is
possible for all work.
HEX 4 mm (8x)
Use only applicable components and electrical material.
Always refer to the related information and manuals.
Ridder Drive Systems B.V.
T
+31 (0)341 416 854 -
F
+31 (0)341 416 611 -
I
13
Содержание LogicLink RLL400
Страница 32: ......