2
Package M
English
Deutsch
Component Checklist
IMPORTANT:
Ensure that you have received
all parts according to the component checklist prior to installation.
If any parts are missing or faulty, telephone your local distributor for a replacement.
4mm (x1)
E
3mm (x1)
D
A (x1)
B (x1)
C (x1)
F (x1)
G (x1)
M4x14 (x8)
M-A
M5x14 (x8)
M-B
D5 (x8)
M-C
H (x1)
Please note:
Rubber pad "H" can be glued at the factory on the table clamp "B".
Содержание TS5511
Страница 5: ...ø 10mm 70mm G 4 English Deutsch 2b Montage im Tischloch E F ...
Страница 6: ...Schritt 3 TV TV TV M A M B M C 5 English Deutsch ...
Страница 7: ...Schritt 4 6 English Deutsch ...
Страница 8: ...Schritt 5 Fertig 180 5 180 180 360 20 7 English Deutsch ...
Страница 13: ...4 English Deutsch E ø 10mm 70mm F G 2b Hole Installation ...
Страница 14: ...5 English Deutsch Step 3 TV TV TV M A M B M C ...
Страница 15: ...6 English Deutsch Step 4 ...
Страница 16: ...7 English Deutsch Step 5 Done 180 5 180 180 360 20 ...