2
Package M
English
Deutsch
Component Checklist
IMPORTANT:
Ensure that you have received
all parts according to the component checklist prior to installation.
If any parts are missing or faulty, telephone your local distributor for a replacement.
M4x14 (x4)
M-A
M5x14 (x4)
M-B
D5 (x4)
M-C
4mm (x1)
E
3mm (x1)
D
A (x1)
B (x1)
C (x1)
F (x1)
G (x1)
H (x1)
Please note:
Rubber pad "H" can be glued at the factory on the table clamp "B".
Содержание TS5211
Страница 5: ...10mm 70mm G 4 English Deutsch 2b Montage im Tischloch E F...
Страница 6: ...5 English Deutsch Schritt 3 TV TV TV M A M B M C...
Страница 7: ...6 English Deutsch Schritt 4...
Страница 8: ...7 English Deutsch Schritt 5...
Страница 9: ...8 English Deutsch Fertig 180 5 180 180 360 20...
Страница 14: ...4 English Deutsch E 10mm 70mm F G 2b Hole Installation...
Страница 15: ...5 English Deutsch Step 3 TV TV TV M A M B M C...
Страница 16: ...6 English Deutsch Step 4...
Страница 17: ...7 English Deutsch Step 5...
Страница 18: ...8 English Deutsch Done 180 5 180 180 360 20...