INSTALLATION PROCEDURE
31 October 2001
1-16
Installation Procedure
- For C238 -
1. Turn off the main switch and unplug the power cord.
2. Remove the paper delivery plate (4 screws).
3. Cut the cap [A] off the rear cover of the main body with pliers, then connect the
tape marker cable to the main body.
4. Install the auxiliary bracket [B] on the tape marker with M4 x 8 screws
(accessories) [C].
5. Install the tape marker on the main body with two knob screws [D]
(accessories) in the two outer holes in the tape marker bracket.
NOTE:
1) Tighten the knob screws with a screwdriver to prevent them from
coming loose.
2) Install the lock washer [E] (accessories) with the lower of the two
knob screws.
6. Reinstall the paper delivery plate.
7. Refer to "Common Steps".
C238I006.WMF
C238I536.WMF
[B]
[C]
[D]
[E]
[A]
Содержание Gestetner 5428C
Страница 1: ...SERVICE MANUAL Machine code C238...
Страница 140: ...POINT TO POINT DIAGRAM 31 October 2001 7 2 Location Map C238S500 WMF...
Страница 141: ...31 October 2001 POINT TO POINT DIAGRAM 7 3 P to P Section A C238S501 WMF...
Страница 142: ...POINT TO POINT DIAGRAM 31 October 2001 7 4 Section B C238S502 WMF...
Страница 143: ...31 October 2001 POINT TO POINT DIAGRAM 7 5 P to P Section C C238S503 WMF...
Страница 144: ...POINT TO POINT DIAGRAM 31 October 2001 7 6 Section D C238S504 WMF...
Страница 145: ...31 October 2001 POINT TO POINT DIAGRAM 7 7 P to P Section E C238S505 WMF...
Страница 146: ...POINT TO POINT DIAGRAM 31 October 2001 7 8 Section F C238S506 WMF...
Страница 147: ...31 October 2001 POINT TO POINT DIAGRAM 7 9 P to P Section G C238S507 WMF...
Страница 148: ...POINT TO POINT DIAGRAM 31 October 2001 7 10 Section H C238S508 WMF...