Page C-7
Revised: 3/9/2020
Last Edited by: FR
APX 1000+ Assembly Manual
This page only applies to APX-3000.
Install the 2 vertical monitor rails using the hardware indicated.
C2-2 x 4
W2 x 4
N2 x 4
A5 x 2
W2 x 2
H2-1 x 2
E5 x 2
Threaded
End Up
If you have the
Dual Sensor VR
Option then
install E5VR with
CV1 Bracket