(2) Install the meter to the regulator.
(3) Fasten the regulator support rack to the back of the machine as shown in the figure.
(4) Fasten the air regulator to the support rack as shown in the figure.
(5) Air pressure is displayed in the dial.
(6) Lift the pressure adjustment knob to adjust the pressure as desired, and, when done, push the pressure
adjustment knob down.
(7) Pull the drain plug to drain the glass cup when water accumulates in it.
Note
: 1) Connect argon gas supply for TIG and compressed air for CUT.
Assembly of the Torch Consumables for CUT Torch Head and TIG Torch Head is shown in the following Fig:
Assembly of Consumables for Cut Torch Head
The torch handle is made of fire and heat retarded ceramic. Do not drop the torch or strike anything with it. The
On/Off switch can be positioned on the top, side or bottom of the torch body to allow ease of use. Insert the
electrode in, seat the ring on the electrode, and place the copper on the ring nice and flat. Then, secure all the
parts in place by turning the ceramic cup clockwise until it is snug. Do not over-tighten it and make sure the tip
is placed properly under the cup.
9
Nozzle
Ceramic Cup
Swirl Ring
Electrode
Switch On/Off
Cup Seat
Torch Body
Содержание CT312D
Страница 1: ...CT312D CT416D CT520D DC TIG MMA WELDER with PLASMA CUTTER OPERATION MANUAL 1...
Страница 7: ...7...