
4
Tracer AV Installation Manual
Figure 2-2.
Tracer AV
(back) security cables installed after NTEP certification.
2.3
Cable Connections
The
Tracer AV
provides several cable connections: one for the power cord, one to accommodate the load cell,
communications, remote displays, and keypads. Figure 2-3 shows the assignments for the
Tracer AV
connections.
Details on pin assignments are shown in Table 2-1 through Table 2-5.
Figure 2-3.
Tracer AV
Power Cord Connection, DB-9 Connections, and Setup Switch Access Screw.
Remove Screw to
Power Cord
Connection
Access Setup Switch
DB-9 Connections
Содержание REVOLUTION Tracer AV
Страница 1: ...98316 Tracer AV Aviation Baggage Instrumentation Installation Manual To be the best by every measure...
Страница 2: ......
Страница 10: ...6 Tracer AV Installation Manual Figure 2 6 Remote Display Cutout Figure 2 7 Remote Display Drawing...
Страница 47: ......
Страница 48: ...PN 98316 02 11...