Rice Lake CLS-680 Скачать руководство пользователя страница 3

CLS-680 Old Dominion Installation Detail

© Rice Lake Weighing Systems

 

 All Rights Reserved

3

Connect Power Cable to Low Voltage Disconnect (LVD)

1. Locate the LVD or power wire connected to the LVD wire (commonly blue, labeled power).

The LVD should already be installed (

Figure 6

). LVD might be out of sight so a power wire should be available (

Figure 5

).

If unable to locate LVD connection, consult with forklift service technician or service manager to verify LVD is installed.

2. Connect the red wire from the indicator power supply cable to LVD instead of connecting directly to battery connection.
3. Connect the black wire from the indicator power supply cable to the battery ground.
4. Connect the blue wire from the indicator power supply cable to the forklift chassis.

Figure 5. Connect CLS-420 Indicator Wire to the LVD

Figure 6. Purkeys Dual Shield LVD, Supply Power Terminal Location

Wire Color

Signal

Red

Low Voltage Disconnect (LVD)

Black

Negative on battery

Blue

Chassis ground

Table 1.  CLS-420 Indicator Power Supply Cable Connections

Note

Low Voltage Disconnect (LVD)

Отзывы: