Installation
© Rice Lake Weighing Systems
●
All Rights Reserved
3
2.0
Installation
This section provides an overview of BenchMark LP Low-Profile Bench Scale installation instructions.
2.1 Site Preparation
The scale must not be loaded beyond its capacity, even momentarily. Select a site where there is no chance of overload
weights crossing the platform. Avoid areas where the scale might receive damaging side impacts from wheels or forklift tines,
shock damage from falling objects or where water may damage the scale.
The interface cable between the scale and the indicator must be protected against crushing, cutting or moisture damage. If the
chosen site has such potential dangers, some method of protection, such as running the cable in conduit, will be necessary.
In operation, the scale must be level within 1/4''. Either choose a site where the floor is close to this standard to avoid excessive
shimming, or modify the floor at the chosen site to meet this standard.
2.2 Unpacking
Immediately after unpacking, visually inspect the BenchMark LP to ensure all components are included and undamaged.
If any parts were damaged in shipment, notify Rice Lake Weighing Systems and the shipper immediately.
Remove the four overload stops on the underside of the scale (
).
Figure 2-1. Remove Overload Stops
2.3 Assembly
1. Remove the black scale cover.
2. Remove the summing board cover in the center of the scale.
3. Wire the homerun cable (
).
4. Properly secure the cable with nylon ties (supplied).
5. Using the bubble level next to the summing board, ensure the scale is level.
6. Replace the black scale cover and use the four mounting screws to secure it in place.
7. If necessary, perform a corner correction (
).
8. Replace the summing board cover.
9. Replace the black center cover.
10. Set the stainless steel cover on the scale.
Overload Stops
Overload Stops
Содержание 97662
Страница 1: ...BenchMark LP Low Profile Bench Scale Installation Manual PN 104742 Rev D October 23 2020 ...
Страница 17: ......