
ASSEMBLY
SE8A 01/11
Assembly Section 3-4
© 2011 Alamo Group Inc.
ASSEMBL
Y
The Components of these machines are quite heavy. Block all components up securely
before working under or putting extremities under such parts.
TONGUE
Insert 1-1/8" OD bushing(2) in tongue lug holes. Align bushings between the upright lugs on front of Main
Frame. Use 7/8" x 2-1/2" bolts (1), flatwasher (3), and locknut (4) to secure.
FIGURE Asm-R-0107
AXLE ASSEMBLY
Attach the Rear Axle to the lugs on the rear of the Main Frame using 3/4" x 2" bolts (1), bushings 1" OD x 3/4"
(3), flatwashers (2), and locknuts (4).
FIGURE Asm-R-0108.
CONTROL RODS
Attach level-lift control rod (1) to lug on the rear axle tube (Figure 5), and level-lift control rod (4) to lug on
tongue (Figure 6) using pin (7), washer (5), and cotter pin (6).
Note
: The adjusting nut (3) on control rods should be to rear of machine and secured with jamnut (2).
FIGURE Asm-R-0109 & Asm-R-0110.
Содержание SE8A
Страница 6: ......
Страница 10: ......
Страница 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Страница 30: ...SAFETY SE8A 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Страница 31: ...SAFETY SE8A 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Страница 32: ...SAFETY SE8A 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Страница 33: ...SAFETY SE8A 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Страница 34: ...SAFETY SE8A 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Страница 35: ...SAFETY SE8A 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Страница 36: ...SAFETY SE8A 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Страница 37: ...SAFETY SE8A 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Страница 38: ...SAFETY SE8A 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Страница 40: ......
Страница 41: ......
Страница 67: ......
Страница 93: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 98: ......
Страница 99: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 109: ...Operation Section 4 1 OPERATION SECTION...
Страница 156: ......
Страница 157: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 160: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 4 2011 Alamo Group Inc MAINTENANCE...
Страница 161: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 5 2011 Alamo Group Inc MAINTENANCE...
Страница 174: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 18 2011 Alamo Group Inc MAINTENANCE...
Страница 188: ...Secci n de Seguridad 1 1 SECCI N DE SEGURIDAD...
Страница 189: ......