OPERATION
4211-4211SS 01/11
Operation Section 4-11
© 2011 Alamo Group Inc.
OPERA
T
ION
6. Pre-Operation Inspection and Service
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Never work under the Implement, the framework, or any lifted component
unless the Implement is securely supported or blocked up to prevent
sudden or inadvertent falling which could cause serious injury or even
death.
(SL-36)
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided.
OPS-L-0026
Содержание LOADER 4211
Страница 5: ...Safety Section 1 1 SAFETY SECTION ...
Страница 29: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 34: ......
Страница 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION ...
Страница 46: ......
Страница 47: ...Operation Section 4 1 OPERATION SECTION ...
Страница 90: ......
Страница 91: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 100: ...MAINTENANCE 4211 4211SS 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE ...
Страница 101: ...MAINTENANCE 4211 4211SS 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE ...
Страница 104: ...4211 4211SS SOM 01 11 P N F 3753C Printed U S A 4211 4211SS LOADER ...