ABOUT YOUR WATER HEATER 

BOOSTER CONTROL 

An  isolating  switch  is  installed  in  the  electrical  meter  box  for  the  solar  storage  tank.  This  should  be  left 
switched on to allow the booster heating unit to operate if required. The booster heating unit is for heating 
the water at times of low solar energy gain, such as during very cloudy or rainy weather, or during the colder 
months. 
 
The booster heating unit will only activate if heating is required and power is available from the switchboard. 
When the water is below the thermostat setting, the booster heating unit will turn on and heat the water. The 
booster  heating  unit  will  automatically  turn  off  when  the  temperature  of  the  water  reaches  the  thermostat 
setting. 
 
Leaving the isolating switch switched on will also provide a sufficient period of time each day for the booster 
heating unit to operate, if required, to satisfy the requirements of AS 3498. 
 
The amount of water heated by the raised booster heating unit of the solar Premier Hiline storage tank will be 
150 litres (300 litre model), or 90 litres (180 litre model). 
 

Timer Control Switch 

A  suitably  rated  timer  control  switch  can  be  installed  and  will  help  maximise  energy  savings  with  an 
electrically  boosted  solar  water  heater  connected  to  a 

continuous,  time  of  use

 

or  extended  Off-Peak 

(overnight and day)

 electricity supply. 

 
If used with an extended Off-Peak (overnight and day) electricity supply, the timer switch should: 

 

be  operated  by  a  continuous  power  supply  on  its  own  circuit  from  the  switchboard  with  the  booster 
heating unit operated by the Off-Peak power supply. 

A  double  pole  isolating  switch  is  required  to  be  installed  at  the  switchboard  to  simultaneously  isolate 
both circuits. 

or 

 

be  of  a  type  which  has  an  internal  rechargeable  battery  to  keep  time  when  the  power  supply  is  not 
available to the timer. 

 

Programming the Timer 

Power must be available to the timer control switch before the booster heating unit can be activated. 
 
The timer should be programmed: 

 

to suit the hot water consumption pattern of the household,  

 

with the end of the period to coincide with the commencement of the evening hot water usage, 

 

to enable a boosting period of not less than the recommended continuous length of time for boosting, 
and 

 

for a period when power will be available for the booster heating unit to operate. 

 
It may be necessary to program a second period into the timer, such as prior to the morning hot water usage. 
 

Note:

 When daylight saving time applies, you may consider resetting the timer accordingly. 

 

Содержание Premier Hiline

Страница 1: ...ponsible officer Owner s Guide and Installation Instructions Premier Hiline Solar Water Heater WARNING Plumber Be Aware Use copper pipe ONLY Plastic pipe MUST NOT be used It is a requirement of a sola...

Страница 2: ...rior to installation as different materials may vary in temperature tolerance be at least 13 mm thick however thicker insulation may be required to comply with the requirements of AS NZS 3500 4 be wea...

Страница 3: ...our Water Heater 4 Regular Care 11 Water Supplies 13 Save A Service Call 15 Installation 18 Installation Solar Collectors 28 System Assembly 31 Connection Details 35 Connections Plumbing 37 Connection...

Страница 4: ...re connected by copper pipe work and form a closed circuit which is filled with closed circuit fluid The closed circuit fluid is a solution of a blue non toxic food grade propylene glycol concentrate...

Страница 5: ...nuous flow gas booster then this requirement of AS 3498 can be satisfied provided the booster is energised its preset outlet temperature setting is 70 C or higher and a remote temperature controller i...

Страница 6: ...not be operated unless each of these devices is fitted and is in working order The operation of the over temperature cut out on the thermostat indicates a possibly dangerous situation If the over temp...

Страница 7: ...help maximise energy savings with an electrically boosted solar water heater connected to a continuous time of use or extended Off Peak overnight and day electricity supply If used with an extended O...

Страница 8: ...olar collectors are supplied in the pipe kit The supplied copper solar hot and solar cold pipes MUST BE used If the solar water heater is installed either on a metal roof or in a trafficable area such...

Страница 9: ...ever if it enters a rain water tank it can cause an unpleasant odour to develop and result in the rain water tank having to be drained and cleaned PRECAUTIONS Where damage to property can occur in the...

Страница 10: ...tandards Only a licensed person will have insurance protecting their workmanship for 6 years Make sure you use a licensed person to install this water heater and ask for your Compliance Certificate DO...

Страница 11: ...major five year service be conducted on the water heater Warning Servicing of a water heater must only be carried out by a qualified person Phone Rheem Service or their nearest Accredited Service Agen...

Страница 12: ...gh incidence of water deposits refer to Water Supplies on page 13 EXPANSION CONTROL VALVE In many areas including South Australia Western Australia and scaling water areas an expansion control valve i...

Страница 13: ...he requirements given in these guidelines for the Rheem warranty to apply CHLORIDE AND PH In a high chloride water supply the water can corrode stainless steel parts and cause them to fail Where the c...

Страница 14: ...age 14 Refer to the cold water connection detail on page 37 for the position of the expansion control valve Contact Rheem Service or their nearest Accredited Service Agent if a replacement heating uni...

Страница 15: ...or if the glass is dirty the effectiveness of the solar collectors will be greatly reduced Have the trees trimmed or the solar collectors relocated if the obstruction is permanent or clean the collec...

Страница 16: ...lve with one of a higher pressure rating Heavy flows of hot water until the water heater is cold then stops until water reheats If this occurs when the water heater is being boosted by the electric bo...

Страница 17: ...have your plumber rectify any leaking pipe work Are you using the booster heating unit properly Refer to Booster Control on page 7 Has there been an increase in hot water usage An increase in hot wat...

Страница 18: ...gs or any other hazards of a general nature Advise the occupants of any inconvenience which may occur due to disconnection of existing water and electrical supplies The connection attachment integrati...

Страница 19: ...ld be redundancy within the hot water system design This should ensure the continuity of hot water supply in the event that this water heater was to become inoperable for any reason We recommend you p...

Страница 20: ...s 26 to 27 For multiple water heater installations follow the instructions on pages 43 and 44 SAFE TRAY Where damage to property can occur in the event of the water heater leaking the water heater mus...

Страница 21: ...that section of roof away to drain and the other to the rainwater collection side of the gutter to take the rain water runoff to the rain water tank blocking this section of gutter from the remaining...

Страница 22: ...supply temperature of up to 99 C should be used in conjunction with a Rheem Premier Hiline thermosiphon closed circuit system Refer to the specifications of the temperature limiting device Where a tem...

Страница 23: ...er flow and return system is required in a building a temperature limiting device can only be installed on a dead leg branching off the circulated hot water flow and return pipe If circulated tempered...

Страница 24: ...of 13 mm Should pre drilling be required extreme caution must be observed when penetrating the jacket of the water heater Note If the cylinder is damaged as a result of attaching pipe clips or saddles...

Страница 25: ...ILINE 52H300 WITH S200 SOLAR COLLECTORS 300 Litre Tank Solar Storage Tank kg Solar Collectors kg Pipe Kit kg System kg Model Capacity Empty Full Empty Full Full 52H180K 180 litre 52 232 48 54 6 292 52...

Страница 26: ...INSTALLATION 26 TYPICAL INSTALLATION SOLAR PREMIER HILINE 180 TYPICAL INSTALLATION RHEEM PREMIER HILINE 52H180...

Страница 27: ...INSTALLATION 27 TYPICAL INSTALLATION SOLAR PREMIER HILINE 300 TYPICAL INSTALLATION RHEEM PREMIER HILINE 52H300...

Страница 28: ...n a roof with a pitch less than 10 a Fixed Pitch frame and a tank frame mounting kit are required Refer to your local Solar Distributor for details For an installation of a thermosiphon solar water he...

Страница 29: ...heck your insurance policy covers collector glass breakage Warning No attempt should be made to remove or replace broken collector glass The collector glass is not offered as a replacement part Should...

Страница 30: ...3500 4 be weatherproof and UV resistant be fitted up to and cover the connections on both the solar storage tank and the solar collectors The insulation will offer corrosion protection to a metal roof...

Страница 31: ...e cold assembly HX300 series 2 1 344451 Pipe hot assembly HX180 series 2 1 344453 Pipe hot assembly HX300 series 2 1 337144 Tank to collector spacer 2 2 331928 Collector clamp standard 2 4 330350 Scre...

Страница 32: ...n 12 15 mm for one solar collector or 24 30 mm for two solar collectors higher up the roof from the horizontal than the left hand end of the collector angle s at the inlet side of the solar collectors...

Страница 33: ...e Tank to Collector spacers 24 against the top end of the solar collectors one per collector Metal Roof Locate the Tank to Collector spacers 24 against the top end of the solar collectors one per coll...

Страница 34: ...ept to a minimum to maintain the aesthetics of the installation 17 Closed Circuit Filling Refer to Closed Circuit Fluid on page 45 for details on filling the closed circuit with the closed circuit flu...

Страница 35: ...Collector clamp 12 Tank starter pipe assembly 13 Collector rail 14 Collector straps 15 Collector cold pipe 16 Pressure Relief Valve 200kPa transported behind the electrical cover 17 Tank straps 18 Pre...

Страница 36: ...CONNECTION DETAILS 36 Detail A Collector Filling Bung Assembly Detail B Pressure Relief Valve Assembly Detail C Collector Connector Assembly PRESSURE RELIEF VALVE 200 KPA RETAINING CLIP...

Страница 37: ...r storage tank and prior to the in series water heater supplied from the solar water heater Refer to Circulated Hot Water Flow and Return System on page 23 CONNECTION SIZES Hot water connection G B G...

Страница 38: ...RIES BOOSTER IF INSTALLED The pipe work between the solar storage tank and an in series booster has a minimum recommended pipe size of DN20 MUST BE of copper and be fully insulated with a closed cell...

Страница 39: ...access to the electrical cover of the water heater A drain line from a relief valve must comply with the requirements of AS NZS 3500 4 A drain line must be no longer than 9 metres with no more than th...

Страница 40: ...to the terminal block and earth tab connection ensuring there are no excess wire loops inside the front cover THERMOSTAT SETTING The thermostat is adjustable from 60 C to 70 C The thermostat is adjus...

Страница 41: ...re Temperature rise 2 4 kW 3 6 kW 4 8 kW 180 Cool temperate climate 10 C 50 C 2 hours 1 hours 1 hours Temperate sub tropical climate 15 C 45 C 2 hours 1 hours 1 hour Tropical climate 20 C 40 C 1 hours...

Страница 42: ...chboard EXTENDED OFF PEAK POWER SUPPLY Switchboard Timer Terminal Block TIMER WITHOUT CONTACTOR Timer Terminal Block TIMER WITH CONTACTOR if required EXTENDED OFF PEAK POWER SUPPLY timer with recharge...

Страница 43: ...he manifold 3 The solar storage tanks must be of the same model 4 The cold water line cold and hot water headers and hot water line must be sized to meet the requirements of both AS NZS 3500 4 and the...

Страница 44: ...MULTIPLE INSTALLATIONS 44 RHEEM COMMERCIAL SOLAR PREMIER HILINE DOUBLE ARRAY RHEEM COMMERCIAL SOLAR HILINE DESIGN DOUBLE ARRAY TPR Valve Drain Line Common Discharge Point...

Страница 45: ...r storage tank be filled with water before charging the solar heat exchanger with the closed circuit fluid The closed circuit concentrate is supplied in 1 5 litre bottles Mix the required quantity of...

Страница 46: ...allow air to escape during filling Connect a hose to the service valve located at the bottom right hand corner of the right hand solar collector Using a funnel placed in the end of the hose pour the r...

Страница 47: ...h water Give water to drink DO NOT induce vomiting Seek medical advice Eye Hold eyelids open wash with water for at least 15 minutes Seek medical assistance if effect persists Skin Remove contaminated...

Страница 48: ...tank may contain sediments and should be diverted away from any rainwater tank connected to the roof Turn off the water heater refer to To Turn Off the Water Heater on page 47 Close all hot water taps...

Страница 49: ...p Warning Exercise care to avoid splashing of closed circuit fluid as fluid discharged from the solar collectors may be of a very high temperature Note The closed circuit fluid discharged from the sol...

Страница 50: ...50 This page is intentionally blank...

Страница 51: ...equipment shall be the owner s responsibility In other words the cost of dismantling or removing cupboards doors or walls and the cost of any special equipment to bring the water heater to floor or gr...

Страница 52: ...of the water heater or have consent of the owner to act on their behalf b Contact Rheem Service without undue delay after detection of the defect and in any event within the applicable warranty period...

Отзывы: