background image

#

Remedy

21

Make sure that communication wires from E1 and E2 terminals at the Command Center mounting bracket are securely 
connected at the E1 and E2 terminals respectively on the first controller board in the daisy chain.  Make sure all controllers on 
the daisy chain network are powered on and properly addressed so the Command Center can find them.  For Group Leaders and 
Followers, the address is set at each controller under 

Settings →Equipment→Group‐Member Cfg. 

For standalone units on the 

daisy chain, the address is set at each controller under 

Settings→Equipment→Network Instance

.  Make sure that at least 22 

gauge, shielded wire is used.  Please refer to  the EcoNet Installation Manual for how to daisy chain multiple controllers 
together with a Command Center Display.

Make sure that every evaporator controller in the daisy chain network is powered on.

Make sure all controllers on the daisy chain network are powered on and properly addressed so the Command Center can find 
them.  Every EcoNet board on the daisy chain must have a unique address set.  For Group Leaders and Followers, the address is 
set at each controller under 

Settings →Equipment→Group‐Member Cfg. 

For standalone units on the daisy chain, the address is 

set at each controller under 

Settings→Equipment→Network Instance

.

Make sure that communication wires from E1 and E2 terminals at the Command Center mounting bracket are securely 
connected at the E1 and E2 terminals respectively on the first controller board in the daisy chain.    Make sure that the 
communication wire is securely connected to the E1, E2 and RT terminals between every controller board, and that the wires 
are not crossed from terminal to terminal.    Make sure that at least 

22 gauge, shielded wire

 is used.  Make sure that the 

shielding strands are tied together at every splice and tied to a ground point at one end of the daisy chain only.  Make sure all 
controllers on the daisy chain network are powered on and properly addressed so the Command Center can find them.  Please 
refer to wiring diagram the EcoNet Installation Manual for how to daisy chain multiple controllers together with a Command 
Center Display.  

Make sure that communication wires between 
Command Center Display and EcoNet controller 
are properly connected.

Command Center Display turns on and is 
able to communicate with some 
controllers, but not with others on the 
daisy chain network.

Command Center Display turns on but is 
not communicating with any controllers.

Make sure that communication wires between 
Command Center Display and EcoNet controller 
are properly connected.

Possible conflict of addresses on the network.

Some Evaporator Controllers in the network bus 
may not be powered on.

22

Problem

Possible Cause

Page 4 of 4

Содержание HTPG EcoNet Series

Страница 1: ...Unit Coolers Troubleshooting Guide 3885 Crestwood Pkwy Ste 500 Duluth Georgia 30096 www htpg com Phone 800 288 9488 256 259 7400 Fax 256 259 7478 A member of the Rheem family of brands HTPG EN TG0821...

Страница 2: ...via display under Status Outputs Aux Relay 1 Aux Relay 2 Relay operation for fan speed control is as follows Aux Relay 1 ON Full Speed Aux Relays 1 2 ON Half Speed Aux Relays 1 2 OFF Fans off If dama...

Страница 3: ...g properly proceed to verify defrost cycle duration on the controller display go to Status Defrost Last Defr Time Also force a defrost and wait for it to finish to take note of the duration Low Profil...

Страница 4: ...Settings System Enable and verify that all the controllers in the group are set to YES Verify software version at each controller on the display by navigating to Service So ware Version Every control...

Страница 5: ...ment Network Instance Make sure that communication wires from E1 and E2 terminals at the Command Center mounting bracket are securely connected at the E1 and E2 terminals respectively on the first con...

Страница 6: ...art of initial startup of the controller 4 If the valve does not make any noise a Verify connection to the valve is secure and that the 4 pins on the valve are not bent b Verify that the wiring harnes...

Страница 7: ...6 With the meter test leads touching pins 1 and 3 when the controller signals that the output to the valve reached the desired position between 35 and 65 visible via Status EXV the meter should read a...

Страница 8: ...L MNOL J PI QJ L S NT UV L MI W X YV Y PI QJ L Z L MN NT _ I L aL X I b L c d e g h i j k lV YQL T Nm n L o MI W X YV Y p L T I J S L YoL T I V T L qV T X p I J J rstu v rstu w rstu x y z u y u z e y...

Страница 9: ...6 5 0 8 6 6 4 8 9 0 70 2 5 6 6 8 8 9 76 8 6 5 0 8 6 8 9 5 6 5 6 6 5 6 6 8 6 5 6 8 9 MN 8 8 9 5 0 8 8 6 I O O 0 8 6 8 9 P Q R 5 8 6 N4 85 0 5 6 S70 8 2 T 6 8 9 5 5 9 6 4 2 58 5 0 8 0 0 9 8 6 5 P 5 0 8...

Отзывы: