
ASSEMBLY INSTRUCTIONS
1. Lay the headboard (A) and footboard (B) on a flat surface.
2. Attach the Guard rail (J) to the footboard (B). Refer to FIGURE 1 & 2.
3. Attach the threaded rods (1) into the fixed nuts in the post of the headboard/footboard by turning them manually. See FIGURE 3 and FIGURE 4.
NOTE
: The Guard rail can be installed at either end of the Headboard or Footboard depending on your desired ladder location. When Guard raill
(J) install into the left of the Footboard, refer to option A & B. In the opposite way, the guard rail will install into the right of the Footboard, refer to
option C & D.
IMPORTANT
These bed parts can be cumbersome and heavy, therefore the assistance of two or more people is recommended in order to prevent personal injury
and ensure the bed parts are not damaged during the assembly process.
OPTION A
OPTION B
OPTION C
OPTION D
Fig.4
Fig.4
1
1
11
11
FIGURE 1
FIGURE 2
FIGURE 3
FIGURE 4
A V A L O N S T O R A G E B U N K B E D F U L L O V E R F U L L - A S S E M B L Y I N S T R U C T I O N S
4 8
/