VSP 3500 User Manual 112
Close power after the completion of the Program upgrade, downward the
two dial switches next to the LAN port, dial back to its original position, as
shown in figure: the state of switch downward:
Restart the equipment power, reset through the front panel operation after
the completion of restart, upgrade process finish.