RFtoo PS7080 Скачать руководство пользователя страница 7

 

         

          User Manual of

   

 

 

                   

Dual Band Adjustable Repeater

 

RF37GS-PS7080 

Guangzhou RFtoo Co., Ltd. 

[email protected] 

 

7

  / 

16

 

www.rftoo.com 

Section 4 Installation Instruction 

4.1 Before Installation   

Please verify the uplink and downlink frequencies labeled on the equipment, ensure they 

match  with  your  PO  and  your  system  requirements.  Please  contact  your  sales 

representative if you find any discrepancy.   

Install the equipment only in a normal indoor environment. 

The built-in signal strength indicator supports quick deployment without additional tool and 

equipment. However, we highly recommend that if possible, always use spectrum analyzer 

and other equipment to assist the installation. Ideally, donor signal strength should have 

been  measured  prior  to  the  installation  and  the  link  budget  and  coverage  have  been 

calculated by certified RF system design engineer. BOM, test plan and other documents 

must be in place prior to the installation.   

4.2 Check list 

Please make sure the following items are included in the box delivered to you. If any item 

is missing, contact your sales representative.   

Table.3 check list 

Item 

Quantity 

The Repeater,   

M10x60mm Screw with wallboard anchor 

Customer Manual* 

*  Factory  may  choose  to  ship  the  product  along  with  a  hardcopy  of  this  manual  or  make  it 

available electronically through website download or email.   

 

 

Содержание PS7080

Страница 1: ...USER MANUAL Dual Band Adjustable Repeater PS800 700 System ...

Страница 2: ...ART Connection and Control Interface Table 1 product description Item Description 1 AC 110 240V 50Hz power supply 2 BS Donor antenna port uplink and downlink signals to base station 3 MS Service antenna port uplink and downlink signals to mobiles The picture is only for reference please make the object as the standard 1 2 3 ...

Страница 3: ...LLBOARD holes 6 Drive four screws into the holes on the top line Do not fully tighten the screws 7 Drive the other screws into the two holes on the bottom line Do not fully tighten the screws 8 Check REPEATER alignment and tighten the 8 screws one by one 9 Ground the REPEATER properly to complete the installation Warning Message Do NOT Turn ON the REPEATER until the BS and MS Ports are Connected t...

Страница 4: ...ht alumina casting enclosure The built in external LCD accessible from the bottom of the enclosure allow the uplink and down link gains Output Powers Alarms and so on be configured and optimized easily on site without additional tool Signal strength indicator helps find donor signal source and set up the system in the field without additional equipment Uplink downlink frequency full range or custo...

Страница 5: ...98MHz 758 768MHz Center frequency adjustment step 100KHz 100KHz Bandwidth adjustable default 18Mz PS800 0 1 18MHz 0 1 18MHz Bandwidth adjustable default 10Mz PS700 0 1 10MHz 0 1 10MHz Bandwidth adjustment step 100KHz 100KHz Output Power PS800 30 2dBm 37 2dBm PS700 30 2dBm 37 2dBm Max Gain 85 2dB 90 2dB Gain Range 55 85dB 65 95dB Ripple PS800 6dB 6dB PS700 4dB 4dB Input VSWR 1 5 1 5 Max Input Power...

Страница 6: ...5dB 35dB ACRR 5MHz 30dBc 30dBc 10MHz 30dBc 30dBc Spurious Emission 9KHz 1GHz 36dBm 36dBm 1GHz 12 75GHz 30dBm 30dBm Noise Figure max gain 6dB 6dB Time Delay 8μs 8μs Alarm ALC not Active Green ALC Active 5 10dB Orange ALC Active 15 20dB Red broken No Light self excitation Red flashes Low input signal green flashes Power LED Power ON Green Power OFF No Light AC Power 110 240VAC 50Hz Display and Set L...

Страница 7: ...y recommend that if possible always use spectrum analyzer and other equipment to assist the installation Ideally donor signal strength should have been measured prior to the installation and the link budget and coverage have been calculated by certified RF system design engineer BOM test plan and other documents must be in place prior to the installation 4 2 Check list Please make sure the followi...

Страница 8: ...ervice antennas must have sufficient isolation and 90 dB minimum is recommended to ensure the device is working normally Donor antenna is typically installed on the rooftop or outside wall with high elevation avoiding any obstacle and in line of sight with the base station antenna The positions and number of service antennas must be designed properly by a qualified Completion Test for call qulitit...

Страница 9: ...stem design engineer refer to step 10 5 Adjust the donor antenna orientation 5 1 If spectrum analyzer or other equivalent RF signal strength measurement equipment is available Highly recommended 5 1 1 Set the spectrum analyzer s frequency range bandwidth and other parameters 5 1 2 Connect donor antenna to the input port of spectrum analyzer 5 1 3 Adjust donor antenna direction until 45dBm to 55dBm...

Страница 10: ...ent requires to reduce the uplink and down gains from factory default values 8 Check and ensure BS and MS ports are connected to feedlines Connect the power adapter and plug in the power supply Follow the test plan walk test the call quality in the service area 9 When it is needed service antennas may be relocated to satisfy coverage requirement You will need to get approval from your project mana...

Страница 11: ...ve The unit is for normal indoor environment application Do not install the REPEATER in a strong electric high intensity magnetic corrosive moist excessive temperature and other harsh environments Install the REPEATER in a place that is not accessible by kids and unauthorized individuals Install and ground the unit following local inbuilding and communication site construction codes It is your res...

Страница 12: ... required to avoid self oscillation In case self oscillation happens reposition is required for the antennas 5 The donor antenna must be placed at least 2 meters away from other antennas on the same site 6 All feed line connections must be waterproofed Self oscillation During the walk test if handheld indicates there is signal but no communication this often means self oscillation occurs Check the...

Страница 13: ...eed to take any action 3 ALC work 5 10dB Orange Green Threshold X 42dBm 4 ALC work 15 20dB Red Green Threshold X 37dBm 5 ALC work 25dB self excitation now Red light blinks Red light blinks 1 Adjust the gain If the input signal level is too high or the space of donor antenna and service antenna is not enough 2 If the red light still turning on that means over accepting of donor antenna or strong in...

Страница 14: ...ww rftoo com Section 8 LED Display Panel of Operations Guide Display Details Working Frequency Range Input Output Power Gain Alarm items 1 Click UL or DL click OK Then you can see the frequency click OK again click or Setting the frequency range which you want and click OK finish Click M back to Main Menu ...

Страница 15: ... inquiry Uplink power and downlink power only for checking NO setting Click M back to Main Menu When the display power is below standard Displayed as When the display power is above standard displayed as 3 Click GAIN click OK real time inquiry Uplink gain and downlink gain click or then setting gain which you want click OK finish click M back to Main Menu ...

Страница 16: ...ARM ITEMS click OK real time inquiry PLL Downlink output power AGC Temperature and RF switch Only for checking NO setting click M back to Main Menu 1 DL Output 27dBm OK change to Alarm 2 ALC work 25dB OK change to Alarm 3 The display shows the real time temperature if the temperature goes beyond the up limit displayed as Alarm ...

Отзывы: